Quick answers
What is Kalu Patti Pumped Storage Project (1000 MW)?
Kalu Patti Pumped Storage Project (1000 MW) is a lapsed water and irrigation project in Bhainasaur Bjer Pahar, Lalganj, Mirzapur, Uttar Pradesh. The site covers 952.4 acres.
Who is building it?
The applicant is Renew Hydro Power Private Limited.
Has it been approved?
No. The application was lapsed on 24 Oct 2026, so it is no longer under consideration.
Where is it?
In Bhainasaur Bjer Pahar, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5,554.3 crore and a site of 952.4 acres.
When was it filed?
The application was filed on 19 Jun 2026.
Project details
| Status | Lapsed |
|---|---|
| Status since | 24 Oct 2026 |
| Application filed | 19 Jun 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Renew Hydro Power Private Limited |
| Land area | 952.4 acres (385.4 ha) |
| Project cost | ₹5,554.3 crore |
| Village / locality | Bhainasaur Bjer Pahar |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05033 |
In context
6 applications in Mirzapur since January 2022 are in the same category (Water & irrigation): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhainasaur Bjer Pahar, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Kalu Patti PSP (1000 MW) — under environmental review, 0 m away
- Kalu Patti Pumped Storage Project — cleared for impact study, 400 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 3.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 4.9 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 5.5 km away
- Sukhnai Pumped Storage Project — cleared for impact study, 6.2 km away
- Sukhnai Off-stream Closed Loop PSP — withdrawn, 6.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 6.3 km away
More from Renew Hydro Power Private Limited in Mirzapur
- Kalu Patti PSP (1000 MW) — under environmental review
- Kalu Patti Pumped Storage Project — cleared for impact study
3 Renew Hydro Power projects in Mirzapur
All 4 Renew Hydro Power projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.