"Ordinary Earth Excavation/Mining Project" at Gata No.-300, 302 is an approved mining project in Lilauri, Bareilly, Uttar Pradesh. The site covers 2.6 acres.
Who is building it?
The applicant is Devendra Singh.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 1 Sept 2023), as of 27 Nov 2026.
Where is it?
In Lilauri, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14 lakh and a site of 2.6 acres.
When was it filed?
The application was filed on 1 Sept 2023.
Project details
| Official title | "Ordinary Earth Excavation/Mining Project" at Gata No.-300, 302 in Village: Lilauri, Tehsil: Bareilly, District- Bareilly, Uttar Pradesh. (Lease Area: 1.049 Ha.). |
|---|---|
| Status | Environmental approval granted |
| Status since | 1 Sept 2023 |
| Application filed | 1 Sept 2023 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Devendra Singh |
| Land area | 2.6 acres (1.1 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Lilauri |
| Taluk / tehsil | Bareilly |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-01052 |
In context
6 applications in Bareilly since January 2022 are in the same category (Mining): 5 approved, 1 filed or under review, and 0 withdrawn, lapsed or rejected.
No other mining lease on record has applied within 5 km of this site.
Where it is
Lilauri, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 5.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 5.7 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 5.9 km away
- Proposed EWS and LIG Housing Scheme — environmental approval granted, 6.3 km away
- "Integrated Municipal Solid Waste Management Facility" with capacity of 500TPD — more information requested, 7.6 km away
- Proposed Protected Forest Land to Be Diverted for Entry & Exit Approach to… — forest land use approved, 8.8 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested, 9 km away
- Proposed Protected Forest Land to be diverted for Laying of Underground… — lapsed, 10.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.