Project details
| Official title | Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package 1(A) Ch 00+000Km to Ch 37+375Km) |
|---|---|
| Status | Cleared for impact study |
| Status since | 15 Apr 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Project cost | ₹17 crore |
| Village / locality | Manganpur |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04734 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Manganpur, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase… — under forest review, 1.1 km away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-1) in the… — under forest review, 2.8 km away
- Environmental Clearance of Expansion of Existing Rolling Mill for the… — cleared for impact study, 55 km away
- No Increase in Pollution Load Certificate" for Proposed Expansion of Existing… — initial checks, 86.7 km away
- NOC/Wildlife Clearance of Proposed Private Land (under the Wildlife… — under wildlife review, 89.1 km away
- NOC Wildlife Clearance of Construction of Retail Oultlet Proposed by M/S… — under wildlife review, 89.5 km away
- NOC Wildlife Clearance Of Proposed Non-Forest Land (Private Land) In State… — under wildlife review, 89.6 km away
- BSNL OFC Laying by HDD Method from Km. Ch. 59.000 to 67.800 & Km. Ch. 70.200… — lapsed, 89.6 km away
More from National Highway Authority of India in Muzaffarnagar
- High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase… — under forest review
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-1) in the… — under forest review
- Diversion of Forest land for Road Safety Improvement of Critical junction on… — forest land use approved
4 National Highways Authority of India (NHAI) projects in Muzaffarnagar
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.