| Official title | No Increase in Pollution Load Certificate" for Proposed Expansion of Existing Molasses Based Distillery Capacity From 98 Kld to 123 Kld Along With Addition of Alternative Feedstock As Grain Without Increase in Pollution Load at Village: Tikaula, P.O.: Ramraj, District: Muzaffarnagar, Uttar Pradesh of M/S Tikaula Distillery (A Unit of Tikaula Sugar Mills Limited) |
|---|---|
| Status | Initial checks |
| Status since | 8 Jul 2026 |
| Application filed | 8 Jul 2026 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | M/S Tikaula Distillery |
| Use | Industrial |
| Land area | 47.2 acres (19.1 ha) |
| Project cost | ₹85.5 crore |
| Village / locality | Puthi Ibrahimpur |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04387 |
In context
26 applications in Muzaffarnagar since January 2022 are in the same category (Buildings & townships): 9 approved, 16 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 47.2 acres, this one is larger than 88% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Puthi Ibrahimpur, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC Wildlife Clearance of Construction of Retail Oultlet Proposed by M/S… — under wildlife review, 2.9 km away
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — lapsed, 4.8 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — more information requested, 4.8 km away
- Proposal Of0.1922 Ha Proctected Forest Land to Be Diverted for Entry and Exit… — lapsed, 4.8 km away
- Proposal of 0.1922 Ha Protected Forest Land to Be Diverted for Entry and Exit… — under wildlife review, 4.8 km away
- Forest Land Proposed to be diverted for 132KV Transmission line from Jansath… — under wildlife review, 5.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — under wildlife review, 6.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — lapsed, 6.4 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.