Quick answers
What is this project?
High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package 2 Ch 86+860 Km to Ch 142+195 Km) is a proposed road project in Saidpura, Dhampur, Bijnor, Uttar Pradesh. The site covers 19,253.1 acres.
Who is building it?
The applicant is National Highway Authority of India.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 23 Apr 2026), as of 27 Nov 2026.
Where is it?
In Saidpura, Dhampur, Bijnor, Uttar Pradesh.
How big is it?
It has a stated cost of ₹27.3 crore and a site of 19,253.1 acres.
When was it filed?
The application was filed on 23 Jan 2026.
Project details
| Official title | Development of High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the state of Uttar Pradesh (Package 2 Ch 86+860 Km to Ch 142+195 Km) |
|---|---|
| Status | Cleared for impact study |
| Status since | 23 Apr 2026 |
| Application filed | 23 Jan 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Roads & highways |
| Applicant | National Highway Authority of India |
| Land area | 19,253.1 acres (7,791.5 ha) |
| Project cost | ₹27.3 crore |
| Village / locality | Saidpura |
| Taluk / tehsil | Dhampur |
| District | Bijnor |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04766 |
In context
22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 19,253.1 acres, this one is larger than 84% of them.
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Saidpura, Dhampur, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Close to Shamli-Gorakhpur Highway Package 2: A 58.6-km Stretch in Bijnor, Uttar Pradesh (1.2 km away).
Other projects nearby
- High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase… — under forest review, 1.2 km away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study, 1.8 km away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study, 1.8 km away
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study, 3 km away
- Diversion 1.5ha Reserved Forest Land under social forestry division Bijnor… — more information requested, 27 km away
- Proposed Expansion of Sugar Mill Cane Crushing Capacity From 10000 Tcd to… — environmental approval granted, 33.2 km away
- M/S Bharat Petroleum Corporation Limited Meerut By Proposed A retail outlet… — forest land use approved, 34 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 36.7 km away
More from National Highway Authority of India in Bijnor
- High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase… — under forest review
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study
- High Speed Access Controlled Corridor from Shamli - Gorakhpur (Phase-I) in the… — cleared for impact study
6 National Highways Authority of India (NHAI) projects in Bijnor
All 548 National Highways Authority of India (NHAI) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.