What is Developing? Open the mapMap

Under forest reviewRoads & highways · Bijnor, Uttar Pradesh

High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase I-(Package-2) Chainage 84+500 to Chainage 143+100, Total Length 58.600 Km in the state of Uttar Pradesh

High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase I-(Package-2) Chainage 84+500 to Chainage 143+100, Total Length 58.600 Km in the state of Uttar Pradesh is a proposed road project in Alampur Toda, Bijnor, Uttar Pradesh. The site covers 19,653.5 acres. Its stated project cost is ₹46 crore. As of 27 Nov 2026, its status is “Under forest review” (since 20 Nov 2026).

See it on the live map All projects in Bijnor

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase I-(Package-2) Chainage 84+500 to Chainage 143+100, Total Length 58.600 Km in the state of Uttar Pradesh is a proposed road project in Alampur Toda, Bijnor, Uttar Pradesh. The site covers 19,653.5 acres.

Who is building it?

The applicant is National Highway Authority of India.

Has it been approved?

Not yet. The application is still under review: its status is “Under forest review”, as of 27 Nov 2026.

Where is it?

In Alampur Toda, Bijnor, Uttar Pradesh.

How big is it?

It has a stated cost of ₹46 crore; a site of 19,653.5 acres and 19.9 acres (8.1 ha) of forest land.

When was it filed?

The application was filed on 19 Nov 2026.

In depth: Shamli-Gorakhpur Highway Package 2: A 58.6-km Stretch in Bijnor, Uttar Pradesh — every filing for this project and where each stands.

Project details

Official titleDevelopment of High Speed Access Controlled Corridor from Shamli - Gorakhpur Phase I-(Package-2) Chainage 84+500 to Chainage 143+100, Total Length 58.600 Km in the state of Uttar Pradesh.
StatusUnder forest review
Status since20 Nov 2026
Application filed19 Nov 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantNational Highway Authority of India
Land area19,653.5 acres (7,953.5 ha)
Forest land19.9 acres (8.1 ha)
Project cost₹46 crore
Village / localityAlampur Toda
Taluk / tehsilBijnor
DistrictBijnor
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05457

In context

22 applications in Bijnor since January 2022 are in the same category (Roads & highways): 8 approved, 10 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 6 months from filing to approval. At 19,653.5 acres, this one is larger than 95% of them.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Alampur Toda, Bijnor, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from National Highway Authority of India in Bijnor

6 National Highways Authority of India (NHAI) projects in Bijnor
All 548 National Highways Authority of India (NHAI) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.