Quick answers
What is this project?
Sand/Morrum Mining at Yamuna River Bed over and area of 11.00 Ha./ 27.18 Acer at Gata No. – 21, Khand No.-05 Village- Charkakhadar, Tehsil- Baberu, District- Banda, U.P is a proposed mining project in Charka, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.
Who is building it?
The applicant is Vashishth Associates.
Has it been approved?
Not yet. The application is still under review: its status is “Under environmental review”, as of 27 Nov 2026.
Where is it?
In Charka, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹61 lakh and a site of 27.2 acres.
When was it filed?
The application was filed on 30 May 2026.
Project details
| Status | Under environmental review |
|---|---|
| Status since | 30 Jul 2026 |
| Application filed | 30 May 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Vashishth Associates |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹61 lakh |
| Village / locality | Charka |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04827 |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.
4 other mining leases have applied within 500 m of this site; together with this one they cover 135.9 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Charka, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 0 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — cleared for impact study, 0 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — cleared for impact study, 150 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 200 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — more information requested, 200 m away
- "Sand/Morrum Mine" from Riverbed of Yamuna River — cleared for impact study, 200 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — environmental approval granted, 350 m away
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — cleared for impact study, 350 m away
All 3 Vashishth Associates projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.