What is Developing? Open the mapMap

Cleared for impact studyMining · Banda, Uttar Pradesh

SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03, VILLAGE – CHARKA KHADAR, TEHSIL – BABERU & DISTRICT – BANDA (U.P.)

SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03, VILLAGE – CHARKA KHADAR, TEHSIL – BABERU & DISTRICT – BANDA (U.P.) is a proposed mining project in Charka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres. Its stated project cost is ₹1.5 crore. As of 27 Nov 2026, its status is “Cleared for impact study” (since 18 Sept 2023).

See it on the live map All projects in Banda

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03, VILLAGE – CHARKA KHADAR, TEHSIL – BABERU & DISTRICT – BANDA (U.P.) is a proposed mining project in Charka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.

Who is building it?

The applicant is Ashu Bhati.

Has it been approved?

Yes. Its status is “Cleared for impact study” (since 18 Sept 2023), as of 27 Nov 2026.

Where is it?

In Charka Khadar, Baberu, Banda, Uttar Pradesh.

How big is it?

It has a stated cost of ₹1.5 crore and a site of 27.2 acres.

When was it filed?

The application was filed on 18 Sept 2023.

One of 2 filings for this project. The project's main page, with every filing and where each stands: SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03, VILLAGE – CHARKA…

Project details

StatusCleared for impact study
Status since18 Sept 2023
Application filed18 Sept 2023
Approval soughtEnvironmental approval
Application typeEarly planning
SectorMining
ApplicantAshu Bhati
Land area27.2 acres (11 ha)
Project cost₹1.5 crore
Village / localityCharka Khadar
Taluk / tehsilBaberu
DistrictBanda
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-01056

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 8 Aug 2024Environmental approval granted27.2 acres₹1.5 crore
Early planning filed 18 Sept 2023 (this page)Cleared for impact study27.2 acres₹1.5 crore

In context

231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.

5 other mining leases have applied within 500 m of this site; together with this one they cover 163.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.

Where it is

Charka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Ashu Bhati in Banda

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.