Quick answers
What is this project?
SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03, VILLAGE – CHARKA KHADAR, TEHSIL – BABERU & DISTRICT – BANDA (U.P.) is an approved mining project in Charka Khadar, Baberu, Banda, Uttar Pradesh. The site covers 27.2 acres.
Who is building it?
The applicant is Ashu Bhati.
Has it been approved?
Yes. Its status is “Environmental approval granted” (since 17 Jan 2026), as of 27 Nov 2026.
Where is it?
In Charka Khadar, Baberu, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.5 crore and a site of 27.2 acres.
When was it filed?
The application was filed on 8 Aug 2024.
Project details
| Status | Environmental approval granted |
|---|---|
| Status since | 17 Jan 2026 |
| Application filed | 8 Aug 2024 |
| Approval sought | Environmental approval |
| Application type | New project |
| Sector | Mining |
| Applicant | Ashu Bhati |
| Land area | 27.2 acres (11 ha) |
| Project cost | ₹1.5 crore |
| Village / locality | Charka Khadar |
| Taluk / tehsil | Baberu |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-01946 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 8 Aug 2024 (this page) | Environmental approval granted | 27.2 acres | ₹1.5 crore |
| Early planning filed 18 Sept 2023 | Cleared for impact study | 27.2 acres | ₹1.5 crore |
In context
231 applications in Banda since January 2022 are in the same category (Mining): 146 approved, 70 filed or under review, and 15 withdrawn, lapsed or rejected. The approved ones took a median of 4 months from filing to approval. At 27.2 acres, this one is smaller than 64% of them.
5 other mining leases have applied within 500 m of this site; together with this one they cover 163.1 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 11 mining leases have applied within 5 km.
Where it is
Charka Khadar, Baberu, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- SAND/MORRUM MINE ON RIVER BED OF YAMUNA RIVER AT GATA No. 21, KHAND 03,… — cleared for impact study, 0 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 200 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — cleared for impact study, 200 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — environmental approval granted, 250 m away
- "Charkakhadar Sand/Morrum Mining" on the riverbed of Yamuna River, at Gata… — cleared for impact study, 250 m away
- Sand/Morrum Mining from Yamuna Riverbed — environmental approval granted, 250 m away
- Sand/Morrum Mining from Yamuna Riverbed — under environmental review, 250 m away
- Charkakhadar Sand/Morrum Mining Project at Riverbed of River Yamuna (Khand… — environmental approval granted, 350 m away
More from Ashu Bhati in Banda
- SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9… — environmental approval granted
- SAND/MORRUM MINE ON RIVER BED OF KEN RIVER AT PART OF GATA 5 & PART OF 9… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.