Quick answers
What is Sukhnai Pumped Storage Project?
Sukhnai Pumped Storage Project is a proposed water and irrigation project in Nadi Kathari, Lalganj, Mirzapur, Uttar Pradesh. The site covers 1,876.4 acres.
Who is building it?
The applicant is Hinduja Renewables Energy Private Limited.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 12 Jun 2026), as of 27 Nov 2026.
Where is it?
In Nadi Kathari, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹5,950 crore and a site of 1,876.4 acres.
When was it filed?
The application was filed on 10 Mar 2026.
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 12 Jun 2026 |
| Application filed | 10 Mar 2026 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Water & irrigation |
| Applicant | Hinduja Renewables Energy Private Limited |
| Land area | 1,876.4 acres (759.4 ha) |
| Project cost | ₹5,950 crore |
| Village / locality | Nadi Kathari |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-04223 |
In context
6 applications in Mirzapur since January 2022 are in the same category (Water & irrigation): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nadi Kathari, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Sukhnai Off-stream Closed Loop PSP — withdrawn, 0 m away
- Sukhnai Pumped Storage Project — returned to applicant, 800 m away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 1.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 1.6 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 2.1 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 3 km away
- Kalu Patti PSP (1000 MW) — under environmental review, 6.2 km away
- Kalu Patti Pumped Storage Project (1000 MW) — lapsed, 6.2 km away
More from Hinduja Renewables Energy Private Limited in Mirzapur
- Sukhnai Off-stream Closed Loop PSP — withdrawn
- Sukhnai Pumped Storage Project — returned to applicant
3 Hinduja Renewables Energy projects in Mirzapur
All 4 Hinduja Renewables Energy projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.