Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Devhat, Lalganj, Mirzapur, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
No. The application was lapsed on 12 May 2026, so it is no longer under consideration.
Where is it?
In Devhat, Lalganj, Mirzapur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.9 acres and 3,830 m² of forest land.
When was it filed?
The application was filed on 23 Nov 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:- Devhat, Tehsil:-Lalganj, District:- Mirzapur. |
|---|---|
| Status | Lapsed |
| Status since | 12 May 2026 |
| Application filed | 23 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 3,800 m² |
| Forest land | 3,830 m² |
| Project cost | ₹60 lakh |
| Village / locality | Devhat |
| Taluk / tehsil | Lalganj |
| District | Mirzapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05426 |
In context
10 applications in Mirzapur since January 2022 are in the same category (Fuel stations): 4 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.9 acres, this one is larger than 60% of them.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Devhat, Lalganj, Mirzapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed, 1.6 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed, 2.6 km away
- Sukhnai Pumped Storage Project — cleared for impact study, 3 km away
- Sukhnai Off-stream Closed Loop PSP — withdrawn, 3 km away
- Kalu Patti PSP (1000 MW) — under environmental review, 3.3 km away
- Kalu Patti Pumped Storage Project (1000 MW) — lapsed, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 3.7 km away
- Kalu Patti Pumped Storage Project — cleared for impact study, 3.7 km away
More from Indian Oil Corporation Limited (IOCL) in Mirzapur
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
5 Indian Oil Corporation (IOCL) projects in Mirzapur
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.