Quick answers
What is this project?
Proposed Widening of the Bah-Udi Road From Km. Ch. 5.400 to 20.800 (Total Length 15.400 Km.), by Provincial Division, Lok Nirman Vibhag, Agra is a proposed road project in Chandarpur, Bah, Agra, Uttar Pradesh. The site covers 2.4 acres.
Who is building it?
The applicant is Executive Engineer, Prov. Div., Lok Nirman Vibhag, Agra.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Chandarpur, Bah, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.3 crore; a site of 2.4 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 21 May 2026.
Project details
| Official title | Proposed Widening of the Bah-Udi Road From Km. Ch. 5.400 to 20.800 (Total Length 15.400 Km.), by Provincial Division, Lok Nirman Vibhag, Agra in Tahsil Bah and District Agra (U.P.) |
|---|---|
| Status | More information requested |
| Status since | 30 Sept 2026 |
| Application filed | 21 May 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer, Prov. Div., Lok Nirman Vibhag, Agra |
| Land area | 2.4 acres (1 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹3.3 crore |
| Village / locality | Chandarpur |
| Taluk / tehsil | Bah |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05071 |
In context
17 applications in Agra since January 2022 are in the same category (Roads & highways): 2 approved, 6 filed or under review, and 9 withdrawn, lapsed or rejected. At 2.4 acres, this one is smaller than 75% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Chandarpur, Bah, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC Wildlife Clearance of Proposed Non-Forest Land For Entry & Exit To The… — under wildlife review, 4.9 km away
- Optical Fiber Cable (OFC) Laying — more information requested, 5.8 km away
- Diversion of 0.4134 Hectare National Chambal Sanctuary Reserved Forest Land… — lapsed, 7.5 km away
- Diversion of the Protected Forest Land Proposed to be Diverted For Entry/ Exit… — forest land use approved, 8.3 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under wildlife review, 9.2 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under forest review, 9.2 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — more information requested, 9.2 km away
- The Diversion of Road Side Protected Forest Land on Agra -Bah -Kachaura Ghat… — forest land use approved, 10.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.