Quick answers
What is Optical Fiber Cable (OFC) Laying?
Optical Fiber Cable (OFC) Laying is a proposed telecom project in Bah, Agra, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is M/S Vindhya Telelinks Limited.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Bah, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹24 lakh; a site of 0.2 acres and 1,040 m² of forest land.
When was it filed?
The application was filed on 24 Apr 2026.
Project details
| Official title | Optical Fiber Cable (OFC) Laying in District Agra, Agra Bah Marg (SH-62) from Km 64.5 to Km 74.5 (LHS) & Bah Udi Marg (MDR-138) from Km 5.5 to Km 21.5 (LHS), total length 26.0 km and total land use 0.104 ha Protected Forest Land. |
|---|---|
| Status | More information requested |
| Status since | 12 Jun 2026 |
| Application filed | 24 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | M/S Vindhya Telelinks Limited |
| Land area | 1,000 m² |
| Forest land | 1,040 m² |
| Project cost | ₹24 lakh |
| Village / locality | Bah |
| Taluk / tehsil | Bah |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06359 |
In context
10 applications in Agra since January 2022 are in the same category (Telecom): 0 approved, 2 filed or under review, and 8 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bah, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- NOC Wildlife Clearance of Proposed Non-Forest Land For Entry & Exit To The… — under wildlife review, 2.8 km away
- The Diversion of Road Side Protected Forest Land on Agra -Bah -Kachaura Ghat… — forest land use approved, 4.3 km away
- Proposed Widening of the Bah-Udi Road From Km. Ch. 5.400 to 20.800 (Total… — more information requested, 5.8 km away
- Diversion of 0.4134 Hectare National Chambal Sanctuary Reserved Forest Land… — lapsed, 6.3 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under wildlife review, 7.8 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under forest review, 7.8 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — more information requested, 7.8 km away
- Amended BharatNet Project (Bah-Agra) — lapsed, 11.3 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.