Quick answers
What is this project?
Diversion of 0.4134 Hectare National Chambal Sanctuary Reserved Forest Land Proposed to Be Diverted for 11KV H.T Line for Supply From 33/11KV Sub Station to New State Tubewell No.-349, Under Electrical Distribution Division Bah, District-Agra is a lapsed power project in Nandgawan, Bah, Agra, Uttar Pradesh. The site covers 2.6 acres.
Who is building it?
The applicant is Dvvnl.
Has it been approved?
No. The application was lapsed on 17 Dec 2023, so it is no longer under consideration.
Where is it?
In Nandgawan, Bah, Agra, Uttar Pradesh.
How big is it?
It has a stated cost of ₹14 lakh; a site of 2.6 acres and 1 acres (0.4 ha) of forest land.
When was it filed?
The application was filed on 20 Aug 2023.
Project details
| Status | Lapsed |
|---|---|
| Status since | 17 Dec 2023 |
| Application filed | 20 Aug 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Dvvnl |
| Land area | 2.6 acres (1.1 ha) |
| Forest land | 1 acres (0.4 ha) |
| Project cost | ₹14 lakh |
| Village / locality | Nandgawan |
| Taluk / tehsil | Bah |
| District | Agra |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06461 |
In context
4 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nandgawan, Bah, Agra, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under wildlife review, 1.8 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — under forest review, 1.8 km away
- High-Level Bridge over the Chambal River on the Ater–Jaitpur Road — more information requested, 1.8 km away
- NOC Wildlife Clearance of Proposed Non-Forest Land For Entry & Exit To The… — under wildlife review, 3.8 km away
- Optical Fiber Cable (OFC) Laying — more information requested, 6.3 km away
- Proposed Widening of the Bah-Udi Road From Km. Ch. 5.400 to 20.800 (Total… — more information requested, 7.5 km away
- The Diversion of Road Side Protected Forest Land on Agra -Bah -Kachaura Ghat… — forest land use approved, 8.5 km away
- Amended BharatNet Project (Bah-Agra) — lapsed, 10.2 km away
About this information