What is Project for Laying of Carbon Steel Gas Pipe Line (300mm)?
Project for Laying of Carbon Steel Gas Pipe Line (300mm) is an approved road project in Baghwakhor, Mahoba, Uttar Pradesh. The site covers 1.6 acres.
Who is building it?
The applicant is Indraprastha Gas Limited New Delhi.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 19 Aug 2026), as of 27 Nov 2026.
Where is it?
In Baghwakhor, Mahoba, Uttar Pradesh.
How big is it?
It has a stated cost of ₹86 lakh; a site of 1.6 acres and 1.6 acres (0.7 ha) of forest land.
When was it filed?
The application was filed on 6 Sept 2025.
Project details
| Official title | Project for Laying of Carbon Steel Gas Pipe Line (300mm) along with road on Kabrai Banda Marg (NH-35) from Km. 0.0 to Km. 13.0 (On L.H.S.), Total Km. 13.0 & 0.65 Ha. In Forest Division/ Social Forestry Division Mahoba, District-Mahoba (UP) |
|---|---|
| Status | Forest land use approved |
| Status since | 19 Aug 2026 |
| Application filed | 6 Sept 2025 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited New Delhi |
| Land area | 1.6 acres (0.7 ha) |
| Forest land | 1.6 acres (0.7 ha) |
| Project cost | ₹86 lakh |
| Village / locality | Baghwakhor |
| Taluk / tehsil | Mahoba |
| District | Mahoba |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06821 |
In context
12 applications in Mahoba since January 2022 are in the same category (Roads & highways): 4 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected. At 1.6 acres, this one is smaller than 55% of them.
12 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Baghwakhor, Mahoba, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land proposed to be diverted for the Widening of the Existing… — under forest review, 1.7 km away
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed, 1.9 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — environmental approval granted, 3.6 km away
- Proposed "Building Stone (Granite Khanda, Boulder, Bailast (Gitti))" Project… — cleared for impact study, 3.6 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01… — lapsed, 3.7 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.-512, Khand-01… — cleared for impact study, 3.7 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — lapsed, 3.8 km away
- Building Stone (Khanda, Gitti, Boulders) Project at Gata No.- 512 Khand-03… — cleared for impact study, 3.8 km away
More from Indraprastha Gas Limited New Delhi in Mahoba
- Laying of Carbon Steel Gas Pipe Line (300mm) — under forest review
- Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Laying of Carbon Steel Gas Pipe Line (300mm) — forest land use approved
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
- Project for Laying of Carbon Steel Gas Pipe Line (300mm) — lapsed
10 Indraprastha Gas Limited projects in Mahoba
All 35 Indraprastha Gas Limited projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.