One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along…
Project details
| Official title | Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Muzaffarngar- Bhopa Marg (Pwd Road) From Ch. 85.900 Km to Ch. 91.400 Km LHS for Approx 5.500 Km in District-Muzaffarnagar, Uttar Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 26 Jun 2025 |
| Application filed | 17 Jun 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Raj Kumar Singh |
| Land area | 1,400 m² |
| Forest land | 1,380 m² |
| Project cost | ₹58 lakh |
| Village / locality | Bhopa |
| Taluk / tehsil | Jansath |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05195 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| Change of use filed 3 Jul 2025 | Forest land use approved | 0.3 acres | ₹58 lakh |
| New project filed 17 Jun 2025 (this page) | Lapsed | 0.3 acres | ₹58 lakh |
In context
7 applications in Muzaffarnagar since January 2022 are in the same category (Pipelines): 3 approved, 1 filed or under review, and 3 withdrawn, lapsed or rejected.
9 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bhopa, Jansath, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved, 0 m away
- 0.2063 Ha PF land Proposed to Transfer for approach and exit road for Proposed… — forest land use approved, 2 km away
- 0.07869 Ha PF land Proposed to Transfer for approach and exit road for… — lapsed, 2 km away
- Thana Bhawan to Bijnor Connectivity 18"/16" Dia Steel Gas Pipeline (Approx.… — returned to applicant, 2.6 km away
- Thana Bhawan to Bijnor Connectivity 18"/16" Dia Steel Gas Pipeline (Approx.… — cleared for impact study, 2.6 km away
- Setting up a Greenfield Steel Melt Shop and Rolling Facilities for Production… — lapsed, 4.4 km away
- Expansion of M/s Swarup Steel Industries Private Limited from 170000 MS Billet… — lapsed, 4.5 km away
- production of TMT Bars 165000 MT/Year through rolling mill (CCM) and MS… — environmental approval granted, 4.5 km away
More from Raj Kumar Singh in Muzaffarnagar
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — more information requested
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.