Project details
| Official title | Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas Pipe Line along Muzaffarnagar-Budhana-Baraut Road (MDR 135W) From Ch. 12.570 Km to Ch. 20.470 Km LHS for Total Approx 7.860 Km in District-Muzaffarnagar, Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 12 Jun 2026 |
| Application filed | 4 May 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Raj Kumar Singh |
| Land area | 2,000 m² |
| Forest land | 1,970 m² |
| Project cost | ₹1 crore |
| Village / locality | Harsauli |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05521 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Roads & highways): 6 approved, 7 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 7 months from filing to approval. At 0.5 acres, this one is smaller than 85% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Harsauli, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.1660 Ha PF Land in favour of M/S Hindustan Petroleum… — forest land use approved, 800 m away
- Proposal of 0.1429 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 6.6 km away
- Proposal of 0.1621 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 8 km away
- Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation Limited,… — under forest review, 11.2 km away
- "Development of a New Township by M/s Numax Realcon Private Limited" on the… — returned to applicant, 11.4 km away
- NEW 200 KLD GRAIN BASED DISTILLERY PLANT (RS/ENA/ETHANOL) UNDER CATEGORY (5g)… — lapsed, 11.6 km away
- EXPANSION OF EXISTING GRAIN BASED DISTILLERY FROM 200 KLD TO 400 KLD THROUGH… — lapsed, 11.6 km away
- Proposed Upgradation and Capacity Enhancement From 200 Kld to 250 Kld Ethanol… — initial checks, 11.6 km away
More from Raj Kumar Singh in Muzaffarnagar
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — more information requested
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.