Quick answers
What is this project?
Proposed Forest Land to be Diverted for Construction of connecting Road is an approved road project in Ganchha, Banda, Uttar Pradesh. The site covers 4.1 acres.
Who is building it?
The applicant is Construction Division I Pwd Banda.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 9 Jul 2026), as of 27 Nov 2026.
Where is it?
In Ganchha, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1.9 crore; a site of 4.1 acres and 2.4 acres (1 ha) of forest land.
When was it filed?
The application was filed on 4 Nov 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Construction of connecting Road, in District: Banda. |
|---|---|
| Status | Forest land use approved |
| Status since | 9 Jul 2026 |
| Application filed | 4 Nov 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Construction Division I Pwd Banda |
| Land area | 4.1 acres (1.7 ha) |
| Forest land | 2.4 acres (1 ha) |
| Project cost | ₹1.9 crore |
| Village / locality | Ganchha |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05207 |
In context
9 applications in Banda since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected.
16 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Ganchha, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Ganchha, Gata No.-… — initial checks, 3.7 km away
- "Sand/Morrum Mining" from Riverbed of Ken River Village- Ganchha, Gata No.-… — under environmental review, 3.7 km away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — environmental approval granted, 3.7 km away
- Proposed River Bed Sand/Morrum Mining having lease area 10.0 ha (24.71 acre)… — cleared for impact study, 3.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Glint… — environmental approval granted, 3.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Glint… — cleared for impact study, 3.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty… — environmental approval granted, 3.7 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Wengty… — cleared for impact study, 3.7 km away
More from Construction Division I Pwd Banda in Banda
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending
- Proposed Forest Land to be diverted for Construction of Entrance Gate — forest land use approved
All 4 Construction Division I projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.