Quick answers
What is this project?
Proposed ±800 kV HVDC Line (Hexa lapwing) between Bhadla (HVDC) and Fatehpur (HVDC) (Uttar Pradesh Portion) for establishment of transmission system for evacuation of Power from REZ in Rajasthan (20GW) under Phase-III, Part-I is a proposed power project in Aidalpur, Jalaun, Uttar Pradesh. It seeks 9.7 acres of forest land.
Who is building it?
The applicant is Rajasthan Part I Power Transmission Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Aidalpur, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹800.2 crore and 9.7 acres (3.9 ha) of forest land.
When was it filed?
The application was filed on 31 Mar 2026.
Project details
| Official title | Construction of proposed ±800 kV HVDC Line (Hexa lapwing) between Bhadla (HVDC) and Fatehpur (HVDC) (Uttar Pradesh Portion) for establishment of transmission system for evacuation of Power from REZ in Rajasthan (20GW) under Phase-III, Part-I. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 13 Nov 2026 |
| Application filed | 31 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rajasthan Part I Power Transmission Limited |
| Forest land | 9.7 acres (3.9 ha) |
| Project cost | ₹800.2 crore |
| Village / locality | Aidalpur |
| Taluk / tehsil | Jalaun |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05249 |
Where it is
Aidalpur, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest Land to be diverted for New Construction of Road to Surya… — under forest review, 21.7 km away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — environmental approval granted, 22.6 km away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — cleared for impact study, 22.6 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 22.6 km away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 22.6 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — environmental approval granted, 23.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — cleared for impact study, 23.1 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 23.3 km away
All 6 Rajasthan Part I projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.