Quick answers
What is Bhedi Khurd Sand/Morrum Mining Project on Betwa River?
Bhedi Khurd Sand/Morrum Mining Project on Betwa River is a proposed mining project in Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Balwant Singh.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Feb 2023), as of 27 Nov 2026.
Where is it?
In Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹45 lakh and a site of 50 acres.
When was it filed?
The application was filed on 9 Feb 2023.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Bhedi Khurd Sand/Morrum Mining Project on Betwa River
Project details
| Status | Cleared for impact study |
|---|---|
| Status since | 9 Feb 2023 |
| Application filed | 9 Feb 2023 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Balwant Singh |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹45 lakh |
| Village / locality | Bhenri Khurd |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-00585 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 12 Dec 2023 | Environmental approval granted | 50 acres | ₹45 lakh |
| Early planning filed 9 Feb 2023 (this page) | Cleared for impact study | 50 acres | ₹45 lakh |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
1 other mining lease has applied within 500 m of this site; together with this one they cover 100 acres. Under India's environmental rules, mining leases less than 500 m apart are assessed together as one cluster, so the combined area can decide which clearance is needed. 10 mining leases have applied within 5 km.
Where it is
Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — environmental approval granted, 0 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 50 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 50 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — environmental approval granted, 850 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — cleared for impact study, 850 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 1.4 km away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 1.4 km away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 1.9 km away
More from Balwant Singh in Jalaun
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.