Quick answers
What is this project?
Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa, River at Gata No.1396 G, Khand No. 04, Area 20.242 ha is a proposed mining project in Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The site covers 50 acres.
Who is building it?
The applicant is Ravi Pratap.
Has it been approved?
Yes. Its status is “Cleared for impact study” (since 9 Nov 2024), as of 27 Nov 2026.
Where is it?
In Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh.
How big is it?
It has a stated cost of ₹12.8 crore and a site of 50 acres.
When was it filed?
The application was filed on 11 Sept 2024.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa, River at…
Project details
| Official title | Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa, River at Gata No.1396 G, Khand No. 04, Area 20.242 ha in in Village- Bhedi Khurd, Tehsil- Kalpi, District- Jalaun, Uttar Pradesh of Ravi Pratap Constractor And Suppliers, Prop. Shri Ravi Pratap Singh |
|---|---|
| Status | Cleared for impact study |
| Status since | 9 Nov 2024 |
| Application filed | 11 Sept 2024 |
| Approval sought | Environmental approval |
| Application type | Early planning |
| Sector | Mining |
| Applicant | Ravi Pratap |
| Land area | 50 acres (20.2 ha) |
| Project cost | ₹12.8 crore |
| Village / locality | Bhenri Khurd |
| Taluk / tehsil | Kalpi |
| District | Jalaun |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-02351 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 24 Nov 2025 | Environmental approval granted | 50 acres | ₹12.8 crore |
| Early planning filed 11 Sept 2024 (this page) | Cleared for impact study | 50 acres | ₹12.8 crore |
In context
149 applications in Jalaun since January 2022 are in the same category (Mining): 100 approved, 40 filed or under review, and 9 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 50 acres, this one is larger than 69% of them.
No other mining lease on record is within 500 m of this site; 14 have applied within 5 km.
Where it is
Bhenri Khurd, Kalpi, Jalaun, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa,… — environmental approval granted, 0 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — environmental approval granted, 550 m away
- Proposed Project of riverbed "Sand/Morrum Mining" on the riverbed of Betwa… — cleared for impact study, 550 m away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — environmental approval granted, 850 m away
- Bhedi Khurd Sand/Morrum Mining Project on Betwa River — cleared for impact study, 850 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 900 m away
- Proposed Project of "Sand/Morrum Mine" located at Gata No. 1396 ग (Khand- 05),… — under environmental review, 900 m away
- "Sand/Morrum Mining" from Riverbed of Betwa River — environmental approval granted, 1.1 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.