Project details
| Official title | Proposed Forest Land to be diverted for Widening and Strengthening of Road, in District: Barabanki. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 24 Sept 2026 |
| Application filed | 27 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Pwd Barabanki |
| Land area | 15.8 acres (6.4 ha) |
| Forest land | 15.8 acres (6.4 ha) |
| Project cost | ₹29.6 crore |
| Village / locality | Datauli Chanda |
| Taluk / tehsil | Haidergarh |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05372 |
In context
13 applications in Bara Banki since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 5 withdrawn, lapsed or rejected. At 15.8 acres, this one is larger than 67% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Datauli Chanda, Haidergarh, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Ordinary Soil Mine — environmental approval granted, 2.3 km away
- Proposed forest Land to be diverted for Construction of RCC Minor Bridge &… — lapsed, 2.6 km away
- "Ordinary Earth Mine" — environmental approval granted, 4 km away
- "Ordinary Earth Mine", Village- Paschim Belav, Gata No.-735 & 736 mi, Plot… — environmental approval granted, 4.2 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Barabanki at… — cleared for impact study, 4.3 km away
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 5.7 km away
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed, 6.7 km away
- "Ordinary Earth Mine", Village- Jaskapur, Tehsil- Haidergarh, District-… — environmental approval granted, 7.6 km away
More from Provincial Division Pwd Barabanki in Bara Banki
- Proposed forest Land to be diverted for Construction of RCC Minor Bridge &… — lapsed
- Proposed forest Land to be diverted for Widening & Strengthening of Road — lapsed
- Proposed Forest Land to be diverted for Construction of RCC Minor Bridge &… — forest land use approved
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.