Project details
| Official title | Proposed Forest Land to be Diverted for Laying of Gas Pipeline in District- Barabanki. |
|---|---|
| Status | Lapsed |
| Status since | 2 Nov 2025 |
| Application filed | 28 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Torrent Gas Private Limited |
| Land area | 500 m² |
| Forest land | 450 m² |
| Project cost | ₹2.2 crore |
| Village / locality | Haidargarh |
| Taluk / tehsil | Haidergarh |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05993 |
In context
6 applications in Bara Banki since January 2022 are in the same category (Pipelines): 2 approved, 2 filed or under review, and 2 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Haidargarh, Haidergarh, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 1.3 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Barabanki at… — cleared for impact study, 2.7 km away
- "Ordinary Earth Mine", Village- Madnapur, Gata No.- 165, Lease Area- 0.85 Ha.,… — environmental approval granted, 6.4 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 6.7 km away
- "Ordinary Earth Mine", Village- Jaskapur, Tehsil- Haidergarh, District-… — environmental approval granted, 7.1 km away
- Ordinary Soil Mine — environmental approval granted, 8.8 km away
- Proposed forest Land to be diverted for Construction of RCC Minor Bridge &… — lapsed, 9.1 km away
- "Ordinary Earth Mine" — environmental approval granted, 9.2 km away
More from Torrent Gas Private Limited in Bara Banki
- Proposed Forest Land to be diverted for Laying of Gas Pipeline — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — forest land use approved
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed
- Proposed Diversion for Laying of Gas Pipeline along Faizabad Road (Old NH-27),… — forest land use approved
- Proposed protected forest land to be diverted for Laying of Gas Pipeline along… — lapsed
6 Torrent Gas projects in Bara Banki
All 30 Torrent Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.