Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Lailhaura, Tehsil:- Haidergarh, District:- Barabanki |
|---|---|
| Status | Forest land use approved |
| Status since | 16 Apr 2025 |
| Application filed | 25 Sept 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,200 m² |
| Forest land | 660 m² |
| Project cost | ₹55 lakh |
| Village / locality | Lilhaura |
| Taluk / tehsil | Haidergarh |
| District | Bara Banki |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06911 |
In context
24 applications in Bara Banki since January 2022 are in the same category (Fuel stations): 14 approved, 4 filed or under review, and 6 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.5 acres, this one is smaller than 96% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Lilhaura, Haidergarh, Bara Banki, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Laying of Gas Pipeline — lapsed, 1.3 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) Barabanki at… — cleared for impact study, 1.5 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — in-principle approval, conditions pending, 5.7 km away
- "Ordinary Earth Mine", Village- Madnapur, Gata No.- 165, Lease Area- 0.85 Ha.,… — environmental approval granted, 6.9 km away
- "Ordinary Earth Mine", Village- Jaskapur, Tehsil- Haidergarh, District-… — environmental approval granted, 7.5 km away
- Ordinary Soil Mine — environmental approval granted, 7.9 km away
- Proposed forest Land to be diverted for Construction of RCC Minor Bridge &… — lapsed, 8.2 km away
- "Ordinary Earth Mine" — environmental approval granted, 8.6 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Bara Banki
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — more information requested
- Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
9 Hindustan Petroleum Corporation (HPCL) projects in Bara Banki
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.