Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Fatehgarh-Farrukhabad Road (ODR) Lal Darwaja to Karnalganj Police Chauki (Bholepur) Ch. 0.000 Km to Ch. 3.900 Km (LHS) for Approx 3.900 Km by HPCL is a proposed pipeline project in Farrukhabad, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Farrukhabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹40,000 crore; a site of 0.2 acres and 980 m² of forest land.
When was it filed?
The application was filed on 30 Mar 2026.
Project details
| Official title | Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Fatehgarh-Farrukhabad Road (ODR) Lal Darwaja to Karnalganj Police Chauki (Bholepur) Ch. 0.000 Km to Ch. 3.900 Km (LHS) for Approx 3.900 Km in District-Farrukhabad, Uttar Pradesh. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 25 Nov 2026 |
| Application filed | 30 Mar 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1,000 m² |
| Forest land | 980 m² |
| Project cost | ₹40,000 crore |
| Village / locality | Farrukhabad |
| Taluk / tehsil | Farrukhabad |
| District | Farrukhabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06181 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Farrukhabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- New 2-Lane/4-Lane Major bridges at Km 3+500 on Kali River, Km 39+840 on Ganga… — more information requested, 2.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to Nayara Energy… — forest land use approved, 4.2 km away
- Proposed "Ordinary Soil Mining Project" at Gata No. 131 by Shri Virendra Kumar — under environmental review, 5.3 km away
- Proposed PF land for Entry and Exit of Nayara Energy Limited Retail Outlet on… — forest land use approved, 5.9 km away
- Ordinary Soil Excavation Project — more information requested, 6.2 km away
- Rehabilitation and Upgradation to 2-lane with paved shoulders configuration of… — forest land use approved, 6.7 km away
- proposed "Ordinary Soil Excavation Project" at Gata No.- 128Mi, 129 (Total… — environmental approval granted, 7.3 km away
- Diversion of 0.1530 Hectare of Protected Forest Land Under Social Forestry… — forest land use approved, 7.3 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.