What is Developing? Open the mapMap

In-principle approval, conditions pendingRoads & highways · Mathura, Uttar Pradesh

Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction

Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction is a proposed road project in Rajpur Bangar, Mathura, Uttar Pradesh. The site covers 3.4 acres. Its stated project cost is ₹44.3 crore. As of 27 Nov 2026, its status is “In-principle approval, conditions pending” (since 14 Oct 2026).

See it on the live map All projects in Mathura

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction is a proposed road project in Rajpur Bangar, Mathura, Uttar Pradesh. The site covers 3.4 acres.

Who is building it?

The applicant is Up State Bridge Corporation Limited.

Has it been approved?

Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.

Where is it?

In Rajpur Bangar, Mathura, Uttar Pradesh.

How big is it?

It has a stated cost of ₹44.3 crore; a site of 3.4 acres and 2,520 m² of forest land.

When was it filed?

The application was filed on 4 Sept 2026.

Project details

Official titleDiversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction in District Mathura by Uttar Pradesh State Bridge Corporation Limited, Bridge Construction Unit, Aligarh
StatusIn-principle approval, conditions pending
Status since14 Oct 2026
Application filed4 Sept 2026
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantUp State Bridge Corporation Limited
Land area3.4 acres (1.4 ha)
Forest land2,520 m²
Project cost₹44.3 crore
Village / localityRajpur Bangar
Taluk / tehsilMathura
DistrictMathura
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05419

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 4 Sept 2026 (this page)In-principle approval, conditions pending3.4 acres₹44.3 crore
New project filed 20 Jun 2026Lapsed3.4 acres₹44.3 crore

In context

10 applications in Mathura since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.

14 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Rajpur Bangar, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Up State Bridge Corporation Limited in Mathura

3 Up State Bridge Corporation projects in Mathura
All 17 Up State Bridge Corporation projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.