Quick answers
What is this project?
Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction is a lapsed road project in Rajpur Bangar, Mathura, Uttar Pradesh. The site covers 3.4 acres.
Who is building it?
The applicant is Up State Bridge Corporation Limited.
Has it been approved?
No. The application was lapsed on 22 Jul 2026, so it is no longer under consideration.
Where is it?
In Rajpur Bangar, Mathura, Uttar Pradesh.
How big is it?
It has a stated cost of ₹44.3 crore; a site of 3.4 acres and 2,520 m² of forest land.
When was it filed?
The application was filed on 20 Jun 2026.
One of 2 filings for this project. The project's main page, with every filing and where each stands: Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over…
Project details
| Official title | Diversion of protected forest land for Construction of 604.525 m long Two-lane Fly over bridge, service road and drains on Mathura-Vrindavan Road to Yamuna Expressway Link Road Near Pagal Baba Mandir T-Junction in District Mathura by Uttar Pradesh State Bridge Corporation Limited, Bridge Construction Unit, Aligarh |
|---|---|
| Status | Lapsed |
| Status since | 22 Jul 2026 |
| Application filed | 20 Jun 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Up State Bridge Corporation Limited |
| Land area | 3.4 acres (1.4 ha) |
| Forest land | 2,520 m² |
| Project cost | ₹44.3 crore |
| Village / locality | Rajpur Bangar |
| Taluk / tehsil | Mathura |
| District | Mathura |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06846 |
All filings for this project
This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):
| Filing | Status | Land | Cost |
|---|---|---|---|
| New project filed 4 Sept 2026 | In-principle approval, conditions pending | 3.4 acres | ₹44.3 crore |
| New project filed 20 Jun 2026 (this page) | Lapsed | 3.4 acres | ₹44.3 crore |
In context
10 applications in Mathura since January 2022 are in the same category (Roads & highways): 2 approved, 4 filed or under review, and 4 withdrawn, lapsed or rejected.
14 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rajpur Bangar, Mathura, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of protected forest land for Construction of 604.525 m long Two-lane… — in-principle approval, conditions pending, 0 m away
- Forest Land Proposed for diversion from Vrindavan Gate near Pagal Baba Mandir… — forest land use approved, 700 m away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — lapsed, 1.8 km away
- Proposed "Commercial Rukmani Vihar Avasiya Yojna" project at Plot no. S-3,… — environmental approval granted, 1.8 km away
- Commercial Rukmani Vihar Avasiya Yojna at Plot no. S-3, Sector-03, Vrindavan… — returned to applicant, 1.8 km away
- Proposed Group Housing Building on GH 02, at RukmaniViharAwasiyaYojna Sector… — under environmental review, 2.2 km away
- Affordable Housing and Commercial Project by M/s Hitech Buildcon Pvt Ltd — environmental approval granted, 2.8 km away
- Proposed Group Housing Situated at Khasra No. - 68/ 8 M & 67, Mauza Sunrakh… — more information requested, 3.3 km away
More from Up State Bridge Corporation Limited in Mathura
3 Up State Bridge Corporation projects in Mathura
All 17 Up State Bridge Corporation projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.