Quick answers
What is this project?
Proposed protected forest land to be diverted for Entry/Exit Approach to IOCL Retail Outlet is a lapsed fuel station in Simrabari, Jhansi, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Indian Oil Corporation Limited (IOCL).
Has it been approved?
No. The application was lapsed on 6 Oct 2025, so it is no longer under consideration.
Where is it?
In Simrabari, Jhansi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹55 lakh; a site of 0.5 acres and 1,470 m² of forest land.
When was it filed?
The application was filed on 15 Apr 2025.
Project details
| Official title | Proposed protected forest land to be diverted for Entry/Exit Approach to IOCL Retail Outlet at Village:- Simrawari, Tehsil:-Jhansi, District:- Jhansi. |
|---|---|
| Status | Lapsed |
| Status since | 6 Oct 2025 |
| Application filed | 15 Apr 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Indian Oil Corporation Limited (IOCL) |
| Land area | 2,100 m² |
| Forest land | 1,470 m² |
| Project cost | ₹55 lakh |
| Village / locality | Simrabari |
| Taluk / tehsil | Jhansi |
| District | Jhansi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05537 |
In context
31 applications in Jhansi since January 2022 are in the same category (Fuel stations): 13 approved, 5 filed or under review, and 13 withdrawn, lapsed or rejected. The approved ones took a median of 22 months from filing to approval. At 0.5 acres, this one is smaller than 100% of them.
19 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Simrabari, Jhansi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Laying of 48f Bsnl Ofc Cable Between Jhansi Te to Babina Te — lapsed, 3 km away
- BUILDING STONE AS SANDSTONE KHANDA, BOULDER, BALLAST MINE AT GATA No. – 669 MI… — environmental approval granted, 4.4 km away
- BUILDING STONE AS SANDSTONE KHANDA, BOULDER, BALLAST MINE AT GATA No. – 669 MI… — cleared for impact study, 4.4 km away
- Building Stone (Khanda, Gitti, Boulder) Sand Stone Mine, Araji number-669mi,… — environmental approval granted, 4.5 km away
- Building Stone (Khanda, Gitti, Boulder) Sand Stone Mine, Araji number-669mi,… — cleared for impact study, 4.5 km away
- "Building Stone (Khanda, Boulder, Ballast)" Mining Project at Araji No. 669… — environmental approval granted, 4.6 km away
- "Building Stone (Khanda, Boulder, Ballast)" Mining Project at Araji No. 669… — cleared for impact study, 4.6 km away
- Proposed Khailar Khanda-Boulder/ Gitti- Ballast Mining Project Gata No. 669… — environmental approval granted, 4.7 km away
More from Indian Oil Corporation Limited (IOCL) in Jhansi
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — lapsed
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — more information requested
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — lapsed
15 Indian Oil Corporation (IOCL) projects in Jhansi
All 822 Indian Oil Corporation (IOCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.