Quick answers
What is this project?
Work of Widening and strengthening of Existing Carriageway to Two Lane Configuration in the Stretch from km. 0.00 to km 13.00 (Excluding Rigid Pavement Portion from km 3.10 to km 5.10) & Major Bridge at River Aami on NH 328A in UP EPC Mode is a lapsed road project in Pedari, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The site covers 0.1 acres.
Who is building it?
The applicant is Executive Engineer NH DIVISION PWD BASTI.
Has it been approved?
No. The application was lapsed on 18 Jul 2023, so it is no longer under consideration.
Where is it?
In Pedari, Khalilabad, Sant Kabir Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹52.9 crore; a site of 0.1 acres and 1,000 m² of forest land.
When was it filed?
The application was filed on 9 Dec 2022.
Project details
| Status | Lapsed |
|---|---|
| Status since | 18 Jul 2023 |
| Application filed | 9 Dec 2022 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Executive Engineer NH DIVISION PWD BASTI |
| Land area | 400 m² |
| Forest land | 1,000 m² |
| Project cost | ₹52.9 crore |
| Village / locality | Pedari |
| Taluk / tehsil | Khalilabad |
| District | Sant Kabir Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05448 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Pedari, Khalilabad, Sant Kabir Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land of Nh-328a (Nandaur-Khalilabad Road) to Be… — more information requested, 100 m away
- Protected Forest Land to be Diverted for Entry/Exit approach to Reliance BP… — forest land use approved, 8.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — more information requested, 9.1 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — lapsed, 9.1 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 9.6 km away
- Diversion of 0.5070 Ha. Protected Forest Land for Shifting of Proposed Toll… — under forest review, 10.9 km away
- Proposed Reserved Forest Land to be diverted for KHALILABAD-BAHRAICH NEW… — more information requested, 14.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 14.5 km away
More from Executive Engineer NH DIVISION PWD BASTI in Sant Kabir Nagar
- Proposed Protected Forest Land of Nh-328a (Nandaur-Khalilabad Road) to Be… — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.