Quick answers
What is this project?
Proposed Reserved Forest Land to be diverted for KHALILABAD-BAHRAICH NEW RAILWAY LINE from Ch-13.820 to Ch. 15.200 in Khalilabad Reserved Forest Block is a proposed railway project in Sidhauna, Mehdawal, Sant Kabir Nagar, Uttar Pradesh. The site covers 620.2 acres.
Who is building it?
The applicant is Ministry of Railway.
Has it been approved?
Not yet. The application is still under review: its status is “More information requested”, as of 27 Nov 2026.
Where is it?
In Sidhauna, Mehdawal, Sant Kabir Nagar, Uttar Pradesh.
How big is it?
It has a stated cost of ₹4,939.8 crore; a site of 620.2 acres and 2.6 acres (1.1 ha) of forest land.
When was it filed?
The application was filed on 27 Apr 2026.
Project details
| Official title | Proposed Reserved Forest Land to be diverted for KHALILABAD-BAHRAICH NEW RAILWAY LINE from Ch-13.820 to Ch. 15.200 in Khalilabad Reserved Forest Block in District-Sant Kabir Nagar, UP. |
|---|---|
| Status | More information requested |
| Status since | 19 Nov 2026 |
| Application filed | 27 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Railways & metro |
| Applicant | Ministry of Railway |
| Land area | 620.2 acres (251 ha) |
| Forest land | 2.6 acres (1.1 ha) |
| Project cost | ₹4,939.8 crore |
| Village / locality | Sidhauna |
| Taluk / tehsil | Mehdawal |
| District | Sant Kabir Nagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06747 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Sidhauna, Mehdawal, Sant Kabir Nagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Construction of Railway Overbridge — forest land use approved, 3.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 3.3 km away
- Work of Widening and strengthening of Existing Carriageway to Two Lane… — lapsed, 14.4 km away
- Proposed Protected Forest Land of Nh-328a (Nandaur-Khalilabad Road) to Be… — more information requested, 14.4 km away
- Proposed forest land to be diverted for Entry/Exit approach to BPCL Retail… — forest land use approved, 20.3 km away
- Diversion of 0.5070 Ha. Protected Forest Land for Shifting of Proposed Toll… — under forest review, 20.6 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to… — lapsed, 20.9 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipeline — more information requested, 21.1 km away
All 149 Ministry of Railway projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.