Quick answers
What is this project?
Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along Budaun-Bareilly National Higway (NH-530B) From Existing Ch. 78.737 Km to Existing Ch. 78.383 Km RHS, From Existing Ch. 75.239 Km to Existing Ch. 71.161 Km RHS and From Existing Ch. 71.161 Km to Existing Ch. 70.861 Km LHS for Approx 4.732 Km by HPCL is a proposed pipeline project in Deochara, Aonla, Bareilly, Uttar Pradesh. The site covers 0.6 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Deochara, Aonla, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2 crore; a site of 0.6 acres and 2,600 m² of forest land.
When was it filed?
The application was filed on 1 Apr 2026.
Project details
| Official title | Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along Budaun-Bareilly National Higway (NH-530B) From Existing Ch. 78.737 Km to Existing Ch. 78.383 Km RHS, From Existing Ch. 75.239 Km to Existing Ch. 71.161 Km RHS and From Existing Ch. 71.161 Km to Existing Ch. 70.861 Km LHS for Approx 4.732 Km in District-Bareilly, Uttar Pradesh. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 26 Nov 2026 |
| Application filed | 1 Apr 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 2,600 m² |
| Forest land | 2,600 m² |
| Project cost | ₹2 crore |
| Village / locality | Deochara |
| Taluk / tehsil | Aonla |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05460 |
In context
9 applications in Bareilly since January 2022 are in the same category (Pipelines): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Deochara, Aonla, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Amended Bharat Net — lapsed, 1.9 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — forest land use approved, 4.8 km away
- Proposed Forest Land to be diverted for Entry/Exit approach to BPCL Retail… — lapsed, 5.6 km away
- Proposed Reserved Forest Land to be diverted for Laying of Natural Gas… — under forest review, 5.8 km away
- Proposed Reserved Forest Land to be re-diverted for Laying of Natural Gas… — lapsed, 5.8 km away
- Proposed Reserved Forest Land to be diverted for Widening & Upgradation of… — more information requested, 5.9 km away
- Increase in On-Stream Days of Existing Ammonia and Urea Plants and Product Mix… — initial checks, 6 km away
- Manufacturing of Nano-DAP in Existing Nano Fertilizer Plant under Product Mix — initial checks, 6 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Bareilly
- Proposed Reserved Forest Land to be diverted for Laying of Natural Gas… — under forest review
- Proposed Reserved Forest Land to be re-diverted for Laying of Natural Gas… — lapsed
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested
- Proposed Forest Land to be diverted for Laying of Gas Pipe Line along… — more information requested
10 Hindustan Petroleum Corporation (HPCL) projects in Bareilly
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.