What is Developing? Open the mapMap

Forest land use approvedRoads & highways · Bareilly, Uttar Pradesh

Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line along Budaun-Bareilly National Highway (NH-530B) From Design Ch. 199.096 Km to Design Ch. 202.246 Km RHS, From Design Ch. 207.366 Km to Design Ch. 208.036 Km LHS and From Design Ch. 208.036 Km to Design Ch. 217.536 Km RHS for Approx 13.320 Km by HPCL

Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line along Budaun-Bareilly National Highway (NH-530B) From Design Ch. 199.096 Km to Design Ch. 202.246 Km RHS, From Design Ch. 207.366 Km to Design Ch. 208.036 Km LHS and From Design Ch. 208.036 Km to Design Ch. 217.536 Km RHS for Approx 13.320 Km by HPCL is an approved road project in Sirohi, Aonla, Bareilly, Uttar Pradesh. The site covers 1.8 acres. Its stated project cost is ₹6 crore. As of 27 Nov 2026, its status is “Forest land use approved” (since 16 Nov 2026).

See it on the live map All projects in Bareilly

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line along Budaun-Bareilly National Highway (NH-530B) From Design Ch. 199.096 Km to Design Ch. 202.246 Km RHS, From Design Ch. 207.366 Km to Design Ch. 208.036 Km LHS and From Design Ch. 208.036 Km to Design Ch. 217.536 Km RHS for Approx 13.320 Km by HPCL is an approved road project in Sirohi, Aonla, Bareilly, Uttar Pradesh. The site covers 1.8 acres.

Who is building it?

The applicant is Hindustan Petroleum Corporation Limited (HPCL).

Has it been approved?

Yes. Its status is “Forest land use approved” (since 16 Nov 2026), as of 27 Nov 2026.

Where is it?

In Sirohi, Aonla, Bareilly, Uttar Pradesh.

How big is it?

It has a stated cost of ₹6 crore; a site of 1.8 acres and 1.8 acres (0.7 ha) of forest land.

When was it filed?

The application was filed on 3 Apr 2026.

Project details

Official titleProposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line along Budaun-Bareilly National Highway (NH-530B) From Design Ch. 199.096 Km to Design Ch. 202.246 Km RHS, From Design Ch. 207.366 Km to Design Ch. 208.036 Km LHS and From Design Ch. 208.036 Km to Design Ch. 217.536 Km RHS for Approx 13.320 Km in District-Bareilly, Uttar Pradesh.
StatusForest land use approved
Status since16 Nov 2026
Application filed3 Apr 2026
Approval soughtForest land use
Application typeChange of use
SectorRoads & highways
ApplicantHindustan Petroleum Corporation Limited (HPCL)
Land area1.8 acres (0.7 ha)
Forest land1.8 acres (0.7 ha)
Project cost₹6 crore
Village / localitySirohi
Taluk / tehsilAonla
DistrictBareilly
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-05783

In context

13 applications in Bareilly since January 2022 are in the same category (Roads & highways): 2 approved, 7 filed or under review, and 4 withdrawn, lapsed or rejected. At 1.8 acres, this one is smaller than 70% of them.

2 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Sirohi, Aonla, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Hindustan Petroleum Corporation Limited (HPCL) in Bareilly

10 Hindustan Petroleum Corporation (HPCL) projects in Bareilly
All 508 Hindustan Petroleum Corporation (HPCL) projects across India

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.