Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Bareilly-Pilibhit Road (NH-30) is an approved pipeline project in Hafizganj, Nawabganj, Bareilly, Uttar Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 30 Sept 2024), as of 27 Nov 2026.
Where is it?
In Hafizganj, Nawabganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹7 crore; a site of 3.7 acres and 3.7 acres (1.5 ha) of forest land.
When was it filed?
The application was filed on 3 Jun 2024.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 30 Sept 2024 |
| Application filed | 3 Jun 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3.7 acres (1.5 ha) |
| Forest land | 3.7 acres (1.5 ha) |
| Project cost | ₹7 crore |
| Village / locality | Hafizganj |
| Taluk / tehsil | Nawabganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06034 |
In context
9 applications in Bareilly since January 2022 are in the same category (Pipelines): 1 approved, 7 filed or under review, and 1 withdrawn, lapsed or rejected.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hafizganj, Nawabganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 750 m away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 1.6 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — lapsed, 1.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 1.8 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 2.6 km away
- Protected forest land proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 2.8 km away
- Township and Area Development Project Sapthnath Eco CIty' — cleared for impact study, 12.2 km away
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn, 12.2 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Bareilly
- Proposed Reserved Forest Land to be diverted for Laying of Natural Gas… — under forest review
- Proposed Reserved Forest Land to be re-diverted for Laying of Natural Gas… — lapsed
- Proposed Protected Forest Land to be re-diverted for Laying of Gas Pipe Line… — forest land use approved
- Protected Forest for Non-Forest Purpose for Laying of Gas Pipe Line along… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — more information requested
- Proposed Forest Land to be diverted for Laying of Gas Pipe Line along… — more information requested
10 Hindustan Petroleum Corporation (HPCL) projects in Bareilly
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.