Quick answers
What is this project?
Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Maalgodam Chauraha to Kisan Dharm Kanta, Rampur-Bilaspur PWD Road (Ch. 0.000 to Ch. 5.880) for Approx 5.880 Kms by HPCL is a lapsed pipeline project in Rampur, Uttar Pradesh. The site covers 0.2 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 6 May 2026, so it is no longer under consideration.
Where is it?
In Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹58 lakh; a site of 0.2 acres and 740 m² of forest land.
When was it filed?
The application was filed on 11 Feb 2023.
Project details
| Official title | Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Maalgodam Chauraha to Kisan Dharm Kanta, Rampur-Bilaspur PWD Road (Ch. 0.000 to Ch. 5.880) for Approx 5.880 Kms in District-Rampur |
|---|---|
| Status | Lapsed |
| Status since | 6 May 2026 |
| Application filed | 11 Feb 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 700 m² |
| Forest land | 740 m² |
| Project cost | ₹58 lakh |
| Village / locality | Rampur |
| Taluk / tehsil | Rampur |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-05510 |
In context
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 1 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of… — more information requested, 2.7 km away
- Forest Land proposed for Exit/Entry and Middle of Indian Oil Coroporation Ltd… — more information requested, 3.5 km away
- Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 3.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved, 4.7 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 9 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 9.6 km away
- Diversion of 0.9241 Ha. forest land for Jio Digital Fibre Private Limited… — initial checks, 10.2 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Rampur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — forest land use approved
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — lapsed
8 Hindustan Petroleum Corporation (HPCL) projects in Rampur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.