Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet is an approved fuel station in Naimgang, Rampur, Uttar Pradesh. The site covers 0.9 acres.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 6 May 2026), as of 27 Nov 2026.
Where is it?
In Naimgang, Rampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 0.9 acres and 2,150 m² of forest land.
When was it filed?
The application was filed on 19 Feb 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:-Nayagaon Milak Tahabber, Tehsil:-Sadar ,District:-Rampur. |
|---|---|
| Status | Forest land use approved |
| Status since | 6 May 2026 |
| Application filed | 19 Feb 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,500 m² |
| Forest land | 2,150 m² |
| Project cost | ₹65 lakh |
| Village / locality | Naimgang |
| Taluk / tehsil | Rampur |
| District | Rampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07239 |
In context
30 applications in Rampur since January 2022 are in the same category (Fuel stations): 21 approved, 4 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 9 months from filing to approval. At 0.9 acres, this one is larger than 73% of them.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Naimgang, Rampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 1.3 km away
- Proposed Protected Forest Land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 5.4 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 9.5 km away
- Protected Forest Land proposed for diversion for Entry/Exit approach to Indian… — lapsed, 9.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 10.3 km away
- Bharti Airtel Limited, Project for Laying of Optical Fiber Cable (OFC) — more information requested, 11.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 11.7 km away
- Proposed Protected Forest Land Construction Widening/Upgradation of road by… — lapsed, 12.5 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Rampur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — forest land use approved
- New Retail Outlet of Hpcl, Forest Land Is Required to Be Diverted As Per Fca… — lapsed
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
8 Hindustan Petroleum Corporation (HPCL) projects in Rampur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.