Quick answers
What is this project?
Protected Forest Land Proposed to be diverted for Entry/Exit Approach road to Farmpax Bioenergy LLP's Compressed Bio Gas Plant at Bareilly- Pilibhit Road (NH-30) ch. 10.892 (RHS), Khasra/Gata- 303, Village- Sithra, Tehsil- Nawabganj, District- Bareilly, Uttar Pradesh is an approved industrial building project in Hafizganj, Nawabganj, Bareilly, Uttar Pradesh. The site covers 3.7 acres.
Who is building it?
The applicant is Abhishek singh.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 15 Dec 2025), as of 27 Nov 2026.
Where is it?
In Hafizganj, Nawabganj, Bareilly, Uttar Pradesh.
How big is it?
It has a stated cost of ₹75 lakh; a site of 3.7 acres and 540 m² of forest land.
When was it filed?
The application was filed on 1 Aug 2025.
Project details
| Status | Forest land use approved |
|---|---|
| Status since | 15 Dec 2025 |
| Application filed | 1 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | Abhishek singh |
| Use | Industrial |
| Land area | 3.7 acres (1.5 ha) |
| Forest land | 540 m² |
| Project cost | ₹75 lakh |
| Village / locality | Hafizganj |
| Taluk / tehsil | Nawabganj |
| District | Bareilly |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05720 |
In context
14 applications in Bareilly since January 2022 are in the same category (Buildings & townships): 8 approved, 3 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 3 months from filing to approval. At 3.7 acres, this one is smaller than 86% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Hafizganj, Nawabganj, Bareilly, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed, 950 m away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 2.6 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved, 2.6 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — forest land use approved, 4 km away
- Forest Land Proposed to be diverted for approach access to HPCL Retail Outlet… — lapsed, 4 km away
- Protected forest land proposed to be diverted for Entry/Exit Approach road to… — forest land use approved, 5.3 km away
- Township and Area Development Project Sapthnath Eco CIty' — cleared for impact study, 9.6 km away
- Township and Area Development Project 'Pilibhit Bypass Avasiye Yojna' — withdrawn, 9.6 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.