Quick answers
What is this project?
Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad (Upptcl) Transmission Line (Quad) is a proposed power project in Asdev Mai Nurpur, Shikohabad, Firozabad, Uttar Pradesh. The site covers 1,939.5 acres.
Who is building it?
The applicant is Rajasthan IV 4a Power Transmission Limited.
Has it been approved?
Not yet. The application is still under review: its status is “In-principle approval, conditions pending”, as of 27 Nov 2026.
Where is it?
In Asdev Mai Nurpur, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹558.2 crore; a site of 1,939.5 acres and 56.4 acres (22.8 ha) of forest land.
When was it filed?
The application was filed on 26 Sept 2025.
Project details
| Official title | Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad (Upptcl) Transmission Line (Quad) in Firozabad District, Uttar Pradesh.. |
|---|---|
| Status | In-principle approval, conditions pending |
| Status since | 23 Sept 2026 |
| Application filed | 26 Sept 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Power |
| Applicant | Rajasthan IV 4a Power Transmission Limited |
| Land area | 1,939.5 acres (784.9 ha) |
| Forest land | 56.4 acres (22.8 ha) |
| Project cost | ₹558.2 crore |
| Village / locality | Asdev Mai Nurpur |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05798 |
In context
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Asdev Mai Nurpur, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Jalalpur Marghati Soil Mining Project — environmental approval granted, 2.6 km away
- "Ordinary Soil Mining" Project at Gata No.- 18, 19, 20, 21, 37, Village-… — environmental approval granted, 5.8 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 6.9 km away
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 7.2 km away
- "Ordinary Soil Mining" Project at Gata No.- 571, Village- Pharaul Nagaria,… — initial checks, 13.1 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 14.1 km away
- Proposal Under Van (Sanrakshan Evam Samvardhan) Act-2023 for the Non-Forestry… — under forest review, 15.1 km away
- Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S… — lapsed, 15.4 km away
More from Rajasthan IV 4a Power Transmission Limited in Firozabad
- LILO of one ckt of 765kV Agra (PG) – Fatehpur (PG) 2xS/c line at Ghiror — forest land use approved
All 5 Rajasthan IV 4a projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.