Quick answers
What is this project?
Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S Vindhya Telelinks Limited along Agra -Etawah Road NH-19 From Km 209.450 To Km 219.00 (LHS) is a lapsed telecom project in Adhampur, Shikohabad, Firozabad, Uttar Pradesh. The site covers 1.7 acres.
Who is building it?
The applicant is Vindhya Telelinks Limited.
Has it been approved?
No. The application was lapsed on 26 Feb 2026, so it is no longer under consideration.
Where is it?
In Adhampur, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹3.5 crore; a site of 1.7 acres and 1.4 acres (0.6 ha) of forest land.
When was it filed?
The application was filed on 22 Jan 2026.
Project details
| Official title | Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S Vindhya Telelinks Limited along Agra -Etawah Road NH-19 From Km 209.450 To Km 219.00 (LHS) In District Agra and From Km 219.000 To Km 289.00 (LHS) In District Firozabad and From Km 289.000 To Km 293.00 (LHS) In District Mainpuri and From Km 293.000 To Km 324.450 (LHS) & Along Sunwara Bypass Road and Along Etawah-Gwalior Road From Km 70.500 To Km 73.670 (LHS) In District Etawah, Uttar Pradesh |
|---|---|
| Status | Lapsed |
| Status since | 26 Feb 2026 |
| Application filed | 22 Jan 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Telecom |
| Applicant | Vindhya Telelinks Limited |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.4 acres (0.6 ha) |
| Project cost | ₹3.5 crore |
| Village / locality | Adhampur |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07043 |
Where it is
Adhampur, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- • Proposal for the Diversion of Road Side Protected Forest for Laying Water… — lapsed, 6.7 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 7.8 km away
- Proposed Integrated Manufacturing & Logistic Cluster (IMLC) - Firozabad — under environmental review, 8.5 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 10.2 km away
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 10.2 km away
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed, 11.9 km away
- LILO of one ckt of 765kV Agra (PG) – Fatehpur (PG) 2xS/c line at Ghiror — forest land use approved, 12.2 km away
- Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad… — in-principle approval, conditions pending, 15.4 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.