Quick answers
What is this project?
The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline Under Multi Group of Village for Surface Water Supply Scheme Jal Jeevan Mission Firozabad Package - 2 Laying Along Shikohabad -Mainpuri Rd SH-84 District Firozabad in the State of Uttar Pradesh is a lapsed pipeline project in Kamarpur Baijua, Shikohabad, Firozabad, Uttar Pradesh. The site covers 3 acres.
Who is building it?
The applicant is Executive Engineer.
Has it been approved?
No. The application was lapsed on 3 Nov 2026, so it is no longer under consideration.
Where is it?
In Kamarpur Baijua, Shikohabad, Firozabad, Uttar Pradesh.
How big is it?
It has a stated cost of ₹1,313.2 crore; a site of 3 acres and 3 acres (1.2 ha) of forest land.
When was it filed?
The application was filed on 1 Jul 2025.
Project details
| Official title | Proposal for the Diversion of Road Side Protected Forest for Laying Water Supply Pipeline Under Multi Group of Village for Surface Water Supply Scheme Jal Jeevan Mission Firozabad Package - 2 Laying Along Shikohabad -Mainpuri Rd SH-84 District Firozabad in the State of Uttar Pradesh . |
|---|---|
| Status | Lapsed |
| Status since | 3 Nov 2026 |
| Application filed | 1 Jul 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Executive Engineer |
| Land area | 3 acres (1.2 ha) |
| Forest land | 3 acres (1.2 ha) |
| Project cost | ₹1,313.2 crore |
| Village / locality | Kamarpur Baijua |
| Taluk / tehsil | Shikohabad |
| District | Firozabad |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06918 |
In context
6 applications in Firozabad since January 2022 are in the same category (Pipelines): 0 approved, 1 filed or under review, and 5 withdrawn, lapsed or rejected.
Where it is
Kamarpur Baijua, Shikohabad, Firozabad, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of 0.0110 Hectare of protected Forest land Under Social Forestry… — forest land use approved, 7.3 km away
- Amended BharatNet Project (Shikohabad-Firozabad) — lapsed, 7.7 km away
- Proposed Protected Forest Land to Be Diverted for Entry and Exit of Bharat… — forest land use approved, 10.1 km away
- LILO of one ckt of 765kV Agra (PG) – Fatehpur (PG) 2xS/c line at Ghiror — forest land use approved, 10.9 km away
- Proposed Forest Land To Be Diverted For Laying Of Optical Fiber Cable By M/S… — lapsed, 11.9 km away
- Jalalpur Marghati Soil Mining Project — environmental approval granted, 12.3 km away
- • Proposal for the Diversion of Road Side Protected Forest for Laying Water… — lapsed, 13.1 km away
- Diversion of Forest Land for the Construction of 400 KV D/C Ghiror-Firozabad… — in-principle approval, conditions pending, 14.1 km away
More from Executive Engineer in Firozabad
- Forest Clearance Regarding Non-Forestry Use of Roadside Protected Forest Land… — lapsed
- Forest Clearance Regarding Non-Forestry Use of 0.6409 Hectares of Roadside… — lapsed
- • Proposal for the Diversion of Road Side Protected Forest for Laying Water… — lapsed
- The Diversion of Road Side Protected Forest for Laying Water Supply Pipeline… — lapsed
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.