Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to Property of New Friends Colony at Village: - Gujra, Tehsil: - Sitapur, District: - Sitapur (Uttar Pradesh). |
|---|---|
| Status | More information requested |
| Status since | 2 Nov 2026 |
| Application filed | 14 Sept 2026 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Buildings & townships |
| Applicant | New Friends Colony |
| Land area | 16 acres (6.5 ha) |
| Forest land | 510 m² |
| Project cost | ₹1.5 crore |
| Village / locality | Gujra |
| Taluk / tehsil | Sitapur |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05867 |
In context
13 applications in Sitapur since January 2022 are in the same category (Buildings & townships): 1 approved, 8 filed or under review, and 4 withdrawn, lapsed or rejected. At 16 acres, this one is larger than 92% of them.
5 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gujra, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — forest land use approved, 500 m away
- "Ordinary Soil Excavation Mining Project" at Gata No. 24, 25, 27, 28, 44 अ… — environmental approval granted, 2.3 km away
- Ordinary Soil Excavation Project — environmental approval granted, 2.7 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — more information requested, 2.9 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — lapsed, 2.9 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 5.1 km away
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved, 6.2 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road… — more information requested, 7 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.