Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail Outlet at Village:- Gujra, Tehsil:- Sitapur, District:- Sitapur. |
|---|---|
| Status | Forest land use approved |
| Status since | 2 May 2026 |
| Application filed | 8 Jul 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 3,200 m² |
| Forest land | 1,630 m² |
| Project cost | ₹65 lakh |
| Village / locality | Gujra |
| Taluk / tehsil | Sitapur |
| District | Sitapur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06116 |
In context
31 applications in Sitapur since January 2022 are in the same category (Fuel stations): 24 approved, 5 filed or under review, and 2 withdrawn, lapsed or rejected. The approved ones took a median of 10 months from filing to approval. At 0.8 acres, this one is smaller than 77% of them.
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Gujra, Sitapur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be Diverted for Entry/Exit Approach to Property of New… — more information requested, 500 m away
- "Ordinary Soil Excavation Mining Project" at Gata No. 24, 25, 27, 28, 44 अ… — environmental approval granted, 2.1 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — more information requested, 2.4 km away
- Proposed Protected Land to be diverted for Entry/Exit approach to BPCL… — lapsed, 2.4 km away
- Ordinary Soil Excavation Project — environmental approval granted, 3.2 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — lapsed, 4.6 km away
- Proposed Protected Forest Land to be diverted for construction of 02 Lane… — forest land use approved, 5.6 km away
- Proposed Forest Land to Be Diverted for Construction of Bridge, Approach Road… — more information requested, 6.5 km away
More from Hindustan Petroleum Corporation Limited (HPCL) in Sitapur
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Forest Land to be Diverted for Entry/Exit approach to HPCL Retail… — lapsed
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to HPCL… — forest land use approved
6 Hindustan Petroleum Corporation (HPCL) projects in Sitapur
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.