Project details
| Official title | Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line along Meerut-Muzaffarngar Road (NH-334) From Ch. 73.300 Km to Ch. 86.800 Km RHS for Approx 13.500 Km in District-Meerut, Uttar Pradesh. |
|---|---|
| Status | Lapsed |
| Status since | 23 Oct 2024 |
| Application filed | 6 Aug 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Pipelines |
| Applicant | Indraprastha Gas Limited |
| Land area | 1.7 acres (0.7 ha) |
| Forest land | 1.7 acres (0.7 ha) |
| Project cost | ₹4 crore |
| Village / locality | Daurala |
| Taluk / tehsil | Sardhana |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-05974 |
In context
6 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Daurala, Sardhana, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- No Increase in Pollution Load Certificate" for Proposed Addition of… — initial checks, 1.3 km away
- f Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — forest land use approved, 1.8 km away
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 2.9 km away
- Diversion of Forest Land for proposed Retail Outlet of BPCL at Km. 82 to 84… — lapsed, 3 km away
- 11 KV HT line for New Sakoti Crossing Station of DFCCIL — more information requested, 4 km away
- Amended Bharat Net Project ( Daurala Sardhana Meerut Division) — lapsed, 4.9 km away
- 4L Spur of Meerut-Garh-Mukteshwar section connecting NH-119 and NH-58… — more information requested, 7.9 km away
- Proposal of Diversion of 0.1318 Ha. Pf Land for the Proposed Retail Outlet of… — forest land use approved, 8.6 km away
More from Indraprastha Gas Limited in Meerut
- Rediversion of 0.2709 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New… — more information requested
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — in-principle approval, conditions pending
- Protected Forest Land Proposed For Transfer For Entry/Exit Approach To… — forest land use approved
- Laying of 8" NB Carbon Steel Gas Pipeline along Daurala-Sardhana Road (RHS)… — forest land use approved
- Diversion of 0.4630 Hectare Protected Forest Land for Non-Forestry Use for 8… — forest land use approved
6 Indraprastha Gas projects in Meerut