Project details
| Official title | Proposal for Rediversion of 0.2709 Ha PF LAND in favour of M/S Indarprastha Gas Ltd. New Delhi Project for Laying of 8" Dia Carbon Steel Gas Pipeline By HDD/Trenching along Meerut-Bijnore Highway, NH-34 from KM. chainage 17 870 to KM. Chainage 24 870 (L.H.S/R.H.S.) TOTAL Length 07 KM, including Crossing at Ch. 23 735 & Ch 24 055 in District-Meerut, Uttar Pradesh. |
|---|---|
| Status | More information requested |
| Status since | 22 Aug 2026 |
| Application filed | 13 May 2026 |
| Approval sought | Forest land use |
| Application type | Change of use |
| Sector | Roads & highways |
| Applicant | Indraprastha Gas Limited |
| Land area | 3,500 m² |
| Forest land | 2,710 m² |
| Project cost | ₹95 lakh |
| Village / locality | Bana |
| Taluk / tehsil | Mawana |
| District | Meerut |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07188 |
In context
15 applications in Meerut since January 2022 are in the same category (Roads & highways): 1 approved, 9 filed or under review, and 5 withdrawn, lapsed or rejected. At 0.9 acres, this one is smaller than 79% of them.
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Bana, Mawana, Meerut, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To Bharat… — lapsed, 150 m away
- Long-Term and Short-Term Improvement Work of Black Spot Identify in Year 2018… — in-principle approval, conditions pending, 4.2 km away
- Laying of 8" NB Carbon Steel Gas Pipeline along Daurala-Sardhana Road (RHS)… — forest land use approved, 5.9 km away
- Expansion of Captive Power Plant from 8 MW to 12.5 MW of M/s Dev Priya… — under environmental review, 6.3 km away
- 4L Spur of Meerut-Garh-Mukteshwar section connecting NH-119 and NH-58… — more information requested, 7.9 km away
- Lilo of 220 KV D/C Nara-Jansath @ 765 KV S/S Meerut Transmission Line — forest land use approved, 9.2 km away
- Amended Bharat Net Project ( Daurala Sardhana Meerut Division) — lapsed, 10.1 km away
- Proposed 400 Bedded Hospital and Allied Facilities at T-2 Pocket, Ganga Nagar,… — initial checks, 10.9 km away
More from Indraprastha Gas Limited in Meerut
- Protected Forest Land Proposed For Diversion For Entry/Exit Approach To… — in-principle approval, conditions pending
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — lapsed
- Protected Forest Land Proposed For Transfer For Entry/Exit Approach To… — forest land use approved
- Laying of 8" NB Carbon Steel Gas Pipeline along Daurala-Sardhana Road (RHS)… — forest land use approved
- Diversion of 0.4630 Hectare Protected Forest Land for Non-Forestry Use for 8… — forest land use approved
6 Indraprastha Gas projects in Meerut
All 84 Indraprastha Gas projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.