Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet is an approved fuel station in Rehra, Utraula, Balrampur, Uttar Pradesh. The site covers 0.8 acres.
Who is building it?
The applicant is Bharat Petroleum Corporation Limited (BPCL).
Has it been approved?
Yes. Its status is “Forest land use approved” (since 27 Jan 2026), as of 27 Nov 2026.
Where is it?
In Rehra, Utraula, Balrampur, Uttar Pradesh.
How big is it?
It has a stated cost of ₹60 lakh; a site of 0.8 acres and 2,180 m² of forest land.
When was it filed?
The application was filed on 16 Oct 2024.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail Outlet at Village:- Rehra, Tehsil:-Utraula, District:- Balrampur. |
|---|---|
| Status | Forest land use approved |
| Status since | 27 Jan 2026 |
| Application filed | 16 Oct 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,400 m² |
| Forest land | 2,180 m² |
| Project cost | ₹60 lakh |
| Village / locality | Rehra |
| Taluk / tehsil | Utraula |
| District | Balrampur |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06371 |
In context
16 applications in Balrampur since January 2022 are in the same category (Fuel stations): 13 approved, 2 filed or under review, and 1 withdrawn, lapsed or rejected. The approved ones took a median of 15 months from filing to approval. At 0.8 acres, this one is larger than 75% of them.
Where it is
Rehra, Utraula, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to Be Diverted for Entry/Exit Approach to Iocl Retail… — forest land use approved, 6.3 km away
- Proposed Protected Forest Land to Be Diverted for Entry/Exit Approach to Iocl… — forest land use approved, 9.1 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved, 10.9 km away
- Jal Jivan Mission — lapsed, 12.3 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 13.2 km away
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 15.2 km away
- Proposed Forest Land to be Diverted for Entry/Exit Approach to IOCL Retail… — in-principle approval, conditions pending, 15.4 km away
- Proposed Common Biomedical Waste Treatment Facility (CBWTF) by M/s Rajveer… — environmental approval granted, 18.2 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Balrampur
- Proposed Forest Land to be Diverted for Entry/Exit approach to BPCL Retail… — lapsed
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to BPCL… — forest land use approved
5 Bharat Petroleum Corporation (BPCL) projects in Balrampur
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.