What is Developing? Open the mapMap

LapsedRoads & highways · Balrampur, Uttar Pradesh

Proposed Forest Land to be diverted for Road Widening and Strengthening work from Ma Pateshwari Devi Mandir Main Gate to Balrampur Chini Mill at Tulsipur (Haraiya Tiraha)-Koylabas Road (MDR), CH-0.000 to CH-2.870 (Length 2870M Protected Forest Land), & Behraich Sirsiya Tulsipu Gulariha Road (State Highway-158) CH. 66.695 to Ch. 69.050 (Length 2355M Non Forest Land)

Proposed Forest Land to be diverted for Road Widening and Strengthening work from Ma Pateshwari Devi Mandir Main Gate to Balrampur Chini Mill at Tulsipur (Haraiya Tiraha)-Koylabas Road (MDR), CH-0.000 to CH-2.870 (Length 2870M Protected Forest Land), & Behraich Sirsiya Tulsipu Gulariha Road (State Highway-158) CH. 66.695 to Ch. 69.050 (Length 2355M Non Forest Land) is a lapsed road project in Kalyanpur, Tulsipur, Balrampur, Uttar Pradesh. The site covers 16.4 acres. Its stated project cost is ₹51.3 crore. As of 27 Nov 2026, its status is “Lapsed” (since 8 Oct 2025).

See it on the live map All projects in Balrampur

Data last refreshed 27 Nov 2026, 6:36 am IST. We check for new filings and status changes twice a day.

Quick answers

What is this project?

Proposed Forest Land to be diverted for Road Widening and Strengthening work from Ma Pateshwari Devi Mandir Main Gate to Balrampur Chini Mill at Tulsipur (Haraiya Tiraha)-Koylabas Road (MDR), CH-0.000 to CH-2.870 (Length 2870M Protected Forest Land), & Behraich Sirsiya Tulsipu Gulariha Road (State Highway-158) CH. 66.695 to Ch. 69.050 (Length 2355M Non Forest Land) is a lapsed road project in Kalyanpur, Tulsipur, Balrampur, Uttar Pradesh. The site covers 16.4 acres.

Who is building it?

The applicant is Provincial Division Pwd Balrampur.

Has it been approved?

No. The application was lapsed on 8 Oct 2025, so it is no longer under consideration.

Where is it?

In Kalyanpur, Tulsipur, Balrampur, Uttar Pradesh.

How big is it?

It has a stated cost of ₹51.3 crore; a site of 16.4 acres and 9.2 acres (3.7 ha) of forest land.

When was it filed?

The application was filed on 29 Aug 2025.

One of 2 filings for this project. The project's main page, with every filing and where each stands: Proposed Forest Land to be diverted for Road Widening and Strengthening work from Ma…

Project details

Official titleProposed Forest Land to be diverted for Road Widening and Strengthening work from Ma Pateshwari Devi Mandir Main Gate to Balrampur Chini Mill at Tulsipur (Haraiya Tiraha)-Koylabas Road (MDR), CH-0.000 to CH-2.870 (Length 2870M Protected Forest Land), & Behraich Sirsiya Tulsipu Gulariha Road (State Highway-158) CH. 66.695 to Ch. 69.050 (Length 2355M Non Forest Land), in District Balrampur, U.P.
StatusLapsed
Status since8 Oct 2025
Application filed29 Aug 2025
Approval soughtForest land use
Application typeNew project
SectorRoads & highways
ApplicantProvincial Division Pwd Balrampur
Land area16.4 acres (6.6 ha)
Forest land9.2 acres (3.7 ha)
Project cost₹51.3 crore
Village / localityKalyanpur
Taluk / tehsilTulsipur
DistrictBalrampur
StateUttar Pradesh
Location fromSite boundary on record
Our referenceWID-UP-06097

All filings for this project

This project has 2 applications on record. Each is a separate step (an impact study, an approval, an expansion…):

FilingStatusLandCost
New project filed 31 Dec 2025More information requested16.4 acres₹51.3 crore
New project filed 29 Aug 2025 (this page)Lapsed16.4 acres₹51.3 crore

In context

5 applications in Balrampur since January 2022 are in the same category (Roads & highways): 0 approved, 3 filed or under review, and 2 withdrawn, lapsed or rejected.

4 other applications of any kind have been filed within 5 km of this site since January 2022.

Where it is

Kalyanpur, Tulsipur, Balrampur, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.

Other projects nearby

More from Provincial Division Pwd Balrampur in Balrampur

About this information

This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.