Quick answers
What is Project for Laying of Optical Fiber Cable (OFC)?
Project for Laying of Optical Fiber Cable (OFC) is a lapsed telecom project in Namdarpur, Musafirkhana, Amethi, Uttar Pradesh. The site covers 0.3 acres.
Who is building it?
The applicant is Vindhya Telelinks Limited.
Has it been approved?
No. The application was lapsed on 15 Dec 2025, so it is no longer under consideration.
Where is it?
In Namdarpur, Musafirkhana, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹43 lakh; a site of 0.3 acres and 1,080 m² of forest land.
When was it filed?
The application was filed on 11 Jan 2024.
Project details
| Official title | Project for Laying of Optical Fiber Cable (OFC) along with on Jagdishpur Bus Stand - Adhanpur (NH-56 Jagdishpur Bypass Marg) from Km. 3.0 To Km. 16.3 & Lucknow Varanasi Marg (NH-731) from Km. 129.500 To Km. 124.200 & Km. 117.400 To Km. 112.00 (On L.H.S.) Total KM 24.0 KM & 0.1077 Ha. In Amethi Forest Division, District-Amethi (UP) |
|---|---|
| Status | Lapsed |
| Status since | 15 Dec 2025 |
| Application filed | 11 Jan 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Telecom |
| Applicant | Vindhya Telelinks Limited |
| Land area | 1,400 m² |
| Forest land | 1,080 m² |
| Project cost | ₹43 lakh |
| Village / locality | Namdarpur |
| Taluk / tehsil | Musafirkhana |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06206 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Namdarpur, Musafirkhana, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed Forest Land to be diverted for Temprary Road Construction Work for… — forest land use approved, 1000 m away
- Laying of 10" dia Steel Pipeline from NH-731 point to Musafirkhana Chauraha on… — forest land use approved, 4.7 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 20.1 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — lapsed, 20.1 km away
- Proposed Brownfield Urea Expansion Project having a capacity of 2500 TPD… — under environmental review, 21.4 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — environmental approval granted, 21.5 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — returned to applicant, 21.5 km away
- Re-diversion for Reliance 4G Project for Laying of Optical Fibre Cable (OFC) — in-principle approval, conditions pending, 21.5 km away
All 45 Vindhya Telelinks projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.