Quick answers
What is this project?
Proposed Forest Land to be diverted for Temprary Road Construction Work for Traffic Route diversion is an approved road project in Nawada, Musafirkhana, Amethi, Uttar Pradesh. The site covers 0.5 acres.
Who is building it?
The applicant is Provincial Division Public Work Department Amethi.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 1 Apr 2026), as of 27 Nov 2026.
Where is it?
In Nawada, Musafirkhana, Amethi, Uttar Pradesh.
How big is it?
It has a stated cost of ₹2.2 crore; a site of 0.5 acres and 940 m² of forest land.
When was it filed?
The application was filed on 3 Nov 2024.
Project details
| Official title | Proposed Forest Land to be diverted for Temprary Road Construction Work for Traffic Route diversion in District: Amethi (UP). |
|---|---|
| Status | Forest land use approved |
| Status since | 1 Apr 2026 |
| Application filed | 3 Nov 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Provincial Division Public Work Department Amethi |
| Land area | 1,900 m² |
| Forest land | 940 m² |
| Project cost | ₹2.2 crore |
| Village / locality | Nawada |
| Taluk / tehsil | Musafirkhana |
| District | Amethi |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-07076 |
In context
2 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Nawada, Musafirkhana, Amethi, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Project for Laying of Optical Fiber Cable (OFC) — lapsed, 1000 m away
- Laying of 10" dia Steel Pipeline from NH-731 point to Musafirkhana Chauraha on… — forest land use approved, 4.8 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — environmental approval granted, 21 km away
- 17 Nos. Court and other allied buildings for Integrated Court Complex — lapsed, 21 km away
- Proposed Brownfield Urea Expansion Project having a capacity of 2500 TPD… — under environmental review, 21.5 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — environmental approval granted, 21.6 km away
- Transfer of Environmental clearance from Indo-Gulf Fertilizers Limited (a unit… — returned to applicant, 21.6 km away
- Proposed Protected Forest Land to be Diverted for Entry/Exit approach to IOCL… — forest land use approved, 22.2 km away
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.