Quick answers
What is this project?
Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail Out-let is a lapsed fuel station in Saimara, Banda, Uttar Pradesh. The site covers 1 acre.
Who is building it?
The applicant is Hindustan Petroleum Corporation Limited (HPCL).
Has it been approved?
No. The application was lapsed on 20 Sept 2025, so it is no longer under consideration.
Where is it?
In Saimara, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹65 lakh; a site of 1 acre and 1,350 m² of forest land.
When was it filed?
The application was filed on 8 Aug 2025.
Project details
| Official title | Proposed Forest Land to be Diverted for Entry/Exit Approach to HPCL Retail Out-let at Village:- Saimary, Tehsil:- Banda, District:- Banda. |
|---|---|
| Status | Lapsed |
| Status since | 20 Sept 2025 |
| Application filed | 8 Aug 2025 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Hindustan Petroleum Corporation Limited (HPCL) |
| Land area | 1 acres (0.4 ha) |
| Forest land | 1,350 m² |
| Project cost | ₹65 lakh |
| Village / locality | Saimara |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06267 |
In context
12 applications in Banda since January 2022 are in the same category (Fuel stations): 9 approved, 0 filed or under review, and 3 withdrawn, lapsed or rejected. The approved ones took a median of 8 months from filing to approval. At 1 acre, this one is larger than 83% of them.
Where it is
Saimara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed forest land to be diverted for Entry/Exit approach to IOCL Retail… — forest land use approved, 10.7 km away
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 10.9 km away
- Proposed Forest Land to be diverted for Widening and Strengthening of Road — forest land use approved, 13.3 km away
- Proposed "Sand/Morrum Mining Project" located at Gata No. Part of 356 (Khand-… — more information requested, 15.4 km away
- Riverbed Sand/Morrum mining having lease area-16.0 ha (39.53 acre), along… — environmental approval granted, 15.6 km away
- Riverbed Sand/Morrum mining having lease area-16.0 ha (39.53 acre), along… — cleared for impact study, 15.6 km away
- "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha.,… — environmental approval granted, 15.7 km away
- "Sand/Morrum Mining" at Gata No. Part of 100 (Khand No.-03), area- 16 Ha.,… — cleared for impact study, 15.7 km away
All 508 Hindustan Petroleum Corporation (HPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.