Quick answers
What is this project?
Proposed Forest Land to be diverted for Widening and Strengthening of Road is an approved road project in Tara, Banda, Uttar Pradesh. The site covers 49.4 acres.
Who is building it?
The applicant is Virendra Kumar Srivastava.
Has it been approved?
Yes. Its status is “Forest land use approved” (since 17 Mar 2026), as of 27 Nov 2026.
Where is it?
In Tara, Banda, Uttar Pradesh.
How big is it?
It has a stated cost of ₹136.9 crore; a site of 49.4 acres and 49.4 acres (20 ha) of forest land.
When was it filed?
The application was filed on 20 Dec 2024.
Project details
| Official title | Proposed Forest Land to be diverted for Widening and Strengthening of Road in District: Banda (UP). |
|---|---|
| Status | Forest land use approved |
| Status since | 17 Mar 2026 |
| Application filed | 20 Dec 2024 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Roads & highways |
| Applicant | Virendra Kumar Srivastava |
| Land area | 49.4 acres (20 ha) |
| Forest land | 49.4 acres (20 ha) |
| Project cost | ₹136.9 crore |
| Village / locality | Tara |
| Taluk / tehsil | Banda |
| District | Banda |
| State | Uttar Pradesh |
| Location from | Site area on record |
| Our reference | WID-UP-06521 |
In context
9 applications in Banda since January 2022 are in the same category (Roads & highways): 3 approved, 5 filed or under review, and 1 withdrawn, lapsed or rejected.
1 other applications of any kind have been filed within 5 km of this site since January 2022.
Where it is
Tara, Banda, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Proposed protected forest land to be diverted for Entry/Exit approach to IOCL… — forest land use approved, 3.7 km away
- Sand/Morrum Mining ,Gata No. 99/3,99/22,100/7,101/5,103/10,104/2,104/5,Total… — under environmental review, 5.7 km away
- "Riverbed Sand/Morrum Mining from Riverbed of Ken River" — environmental approval granted, 5.7 km away
- "Riverbed Sand/Morrum Mining from Riverbed of Ken River" — cleared for impact study, 5.7 km away
- Proposed Project of "Sand/Morrum Mining Project" located at Gata No. 683/43,… — environmental approval granted, 7.1 km away
- Proposed Project of "Sand/Morrum Mining Project" located at Gata No. 683/43,… — cleared for impact study, 7.1 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — environmental approval granted, 8.2 km away
- Proposed riverbed sand/morrum mining project from Ken River of M/s Delving… — cleared for impact study, 8.2 km away
More from Virendra Kumar Srivastava in Banda
- Proposed Forest Land to be Diverted for Widening and Strengthening of Road — more information requested
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.