Project details
| Official title | 0.1657 Ha PF land Proposed For Access Permission To The Proposed Fuel Station Site Of M/S Bharat Petroleum Corporation Limited, Meerut From ShamliMuzaffarnagar Road, National Highway No NH-709AD (OLD SH-12), In Design KM Stone No. 59 (Abutting On The Left Hand Side) At Design Chainage 58+596, (Increasing Chainage Towards Muzaffarnagar), At Khasra No. 204 (Part Of), In Village Dholri, Tehsil Sadar, District Muzaffarnagar, Uttar Pradesh |
|---|---|
| Status | Forest land use approved |
| Status since | 10 Jul 2024 |
| Application filed | 10 Jul 2023 |
| Approval sought | Forest land use |
| Application type | New project |
| Sector | Fuel stations |
| Applicant | Bharat Petroleum Corporation Limited (BPCL) |
| Land area | 3,200 m² |
| Forest land | 1,660 m² |
| Project cost | ₹55 lakh |
| Village / locality | Dhaulri |
| Taluk / tehsil | Muzaffarnagar |
| District | Muzaffarnagar |
| State | Uttar Pradesh |
| Location from | Site boundary on record |
| Our reference | WID-UP-06352 |
In context
15 applications in Muzaffarnagar since January 2022 are in the same category (Fuel stations): 8 approved, 2 filed or under review, and 5 withdrawn, lapsed or rejected. The approved ones took a median of 12 months from filing to approval. At 0.8 acres, this one is smaller than 80% of them.
Where it is
Dhaulri, Muzaffarnagar, Uttar Pradesh. The exact site boundary, satellite view and the full approval history are on the live map — free with a Google sign-in.
Other projects nearby
- Diversion of Pf Land in Favour of M/S Hindustan Petroleum Corporation Limited,… — under forest review, 5.7 km away
- Proposed Protected Forest Land to be re-diverted for Laying of Natural Gas… — more information requested, 13.9 km away
- Diversion of 0.1660 Ha PF Land in favour of M/S Hindustan Petroleum… — forest land use approved, 14 km away
- Proposal of 0.1621 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 14.8 km away
- Proposed 4-Lane widening of the Panipat- Khatima Road (SH-12) from Km. Ch.… — in-principle approval, conditions pending, 16.4 km away
- Proposal of 0.1429 Ha Protected Forest Land to Be Diverted for Entry and Exit… — forest land use approved, 16.7 km away
- Proposed Protected Forest Land to be Re- diverted for Laying of steel Gas… — lapsed, 16.7 km away
- Proposed Protected Forest Land to be diverted for Laying of Gas Pipe Line… — forest land use approved, 18.2 km away
More from Bharat Petroleum Corporation Limited (BPCL) in Muzaffarnagar
- 0.2017 Ha PF land Proposed to Transfer for approach and exit road for Proposed… — forest land use approved
- 0.2063 Ha PF land Proposed to Transfer for approach and exit road for Proposed… — forest land use approved
- 0.07869 Ha PF land Proposed to Transfer for approach and exit road for… — lapsed
4 Bharat Petroleum Corporation (BPCL) projects in Muzaffarnagar
All 656 Bharat Petroleum Corporation (BPCL) projects across India
About this information
This page is compiled from publicly available approval records and rewritten in plain language. Statuses can change between our updates, so check with the authority before making decisions. Spotted a mistake? Tell us.